Washington (State)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    Display note(s)

      Hierarchical terms

      Washington (State)

      Equivalent terms

      Washington (State)

      • UF Washington

      Associated terms

      Washington (State)

        69100 Archival description results for Washington (State)

        1757 results directly related Exclude narrower terms
        US WaBuPNRA D0261A-002-1714 · Item · 1916-12-27
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1714. Install a Barker mail crane at Sundale, Washington, for exchange of mail on account of establishing star route between station and post office. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1763. Correspondence File Number 341. Vancouver Division. Other subject categories: Mail Crane.

        US WaBuPNRA D0261A-002-1940 · Item · 1917-05-16
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1940. Build extension to track. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1965. Correspondence File Number 379-1. Other subject categories: Track Extension.

        US WaBuPNRA D0261A-002-80 · Item · 1909-09-13
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 80. 1000 foot spur track at Stoner, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 97. Correspondence File Number 379-1. Vancouver Division. Other subject categories: Tracks Spur.

        US WaBuPNRA D0261A-002-71 · Item · undated
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 71. Grading 20 foot roadway on First Street at Stevenson, Washington. Correspondence File Number 356-7. Vancouver Division. Other subject categories: Road Grading.

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 790. Installing toilets in depot and connect with city sewer at Stevenson, Washington. Correspondence File Number 356. Vancouver Division. Other subject categories: Plumbing Toilet.

        US WaBuPNRA D0261A-002-1269 · Item · undated
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1269. Build fence on both sides of track west of Rock Creek bridge near Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1376. Correspondence File Number 13-1. Vancouver Division. Other subject categories: Fencing.

        US WaBuPNRA D0261A-002-1779 · Item · 1917
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1779. Replace 2 foot by 2 foot woodbox extension 24 feet long at culvert No. 53-97 in Stevenson Yard with 24 linear feet 30-inch dia. concrete pipe. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1824. Correspondence File Number CE 1824. Vancouver Division. Other subject categories: Culverts.

        US WaBuPNRA D0261A-002-1794 · Item · 1917-02-13
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1794. Install concrete catch basin in sewer. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1844. Correspondence File Number 356. Other subject categories: Sewer.

        US WaBuPNRA D0261A-002-954 · Item · 1914-04-01
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 954. Constructing wagon road under west end Rock Creek Bridge at Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1081. Correspondence File Number 4-1. Vancouver Division. Other subject categories: Road Wagon.

        US WaBuPNRA D0261A-002-935 · Item · 1914-03-13
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 935. Purchase of Mail cart for Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1065. Correspondence File Number 356. Vancouver Division. Other subject categories: Trucks Mail Cart.

        US WaBuPNRA D0261A-002-904 · Item · 1914-02-03
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 904. Assessment of sewer at Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number RW 8. Correspondence File Number 356-7. Vancouver Division. Other subject categories: Assessment Sewer.

        US WaBuPNRA D0261A-002-610 · Item · 1913-01-09
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 610. Value of material in outfit spur at Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 683. Correspondence File Number 356. Vancouver Division. Other subject categories: Tracks Spur.

        US WaBuPNRA D0261A-002-271 · Item · 1911-02-24
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 271. Connecting work track spur with Industrial spur at Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 330. Correspondence File Number 356. Vancouver Division. Other subject categories: Tracks Spur.

        US WaBuPNRA D0261A-002-302 · Item · 1911-05-04
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 302. Construction of eight foot wide sidewalk along right of way at Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 362. Correspondence File Number 356-X. Vancouver Division. Other subject categories: Road Sidewalk.

        US WaBuPNRA D0261A-002-162 · Item · 1910-05-14
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 162. Water supply for depot and section house at Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 210. Correspondence File Number 356-9. Vancouver Division. Other subject categories: Plumbing Water Supply.

        US WaBuPNRA D0261A-002-179 · Item · 1910-06-04
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 179. Constructing spur to connect with Maiden Mill Company's flume. Chief Engineer/Standard Maintenance Procedure AFE Number CE 156. Correspondence File Number 356-1. Vancouver Division. Other subject categories: Tracks Spur.

        US WaBuPNRA D0261A-002-51 · Item · 1909-11-04
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 51. Spur track for Four Lakes Lumber Company at Stevenson, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 55. Vancouver Division. Other subject categories: Tracks Spur.

        US WaBuPNRA D0261A-002-1013 · Item · undated
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1013. Moving toilet from Stevenson, Washington to North Portland Junction. Correspondence File Number 365. Vancouver Division. Other subject categories: Plumbing Toilet.

        US WaBuPNRA D0261A-002-1493 · Item · 1916-05-05
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1493. Install a private crossing 2700 feet west of Milepost 53, near Stevenson, Washington, for Mrs. Eliza Fields, account of her owning land on both sides of the track. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1582. Correspondence File Number 356-4. Vancouver Division. Other subject categories: Road Crossing.

        US WaBuPNRA D0261A-002-1927 · Item · 1917-05-02
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1927. Move Shelter Shed from Cape Horn, Washington to St. Cloud, Washington and extend platform. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1955. Correspondence File Number 400. Other subject categories: Structure Shelter Shed.

        US WaBuPNRA D0261A-002-268 · Item · 1911-02-09
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 268. Filling Spague Gulch trestle, erect culverts. Chief Engineer/Standard Maintenance Procedure AFE Number CE 321. Correspondence File Number 34-23S. Vancouver Division. Other subject categories: Filling Trestle.

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 772. Filling of bridge 373-9 across Brickyard Gulch at Spokane. Chief Engineer/Standard Maintenance Procedure AFE Number CE 830. Correspondence File Number 34-23B. Vancouver Division. Other subject categories: Filling Bridge.

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 773. Replacing of timber structure at Bridge 374.7 at Spokane, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 838. Correspondence File Number 301-LD. Vancouver Division. Other subject categories: Trestle.

        US WaBuPNRA D0261A-002-1036 · Item · undated
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1036. Rebuilding sidewalk and curb under Bridge 375-1 at Spokane. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1173. Correspondence File Number 301-LD. Vancouver Division. Other subject categories: Sidewalk.

        US WaBuPNRA D0261A-002-1897 · Item · 1917-04-07
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1897. Wire changes on Main Avenue. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1940. Correspondence File Number 301-0. Other subject categories: Wire.

        US WaBuPNRA D0261A-002-1781 · Item · 1917
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1781. Pay portion of cost of stringing three pair of wires from Western Union Telegraph office to Terminal Building, Spokane, Washington. Wires for joint SP&S - S&IE use and assumed 50% cost for each road. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1826. Correspondence File Number 301-0. Vancouver Division. Other subject categories: Telegraph.