- US WaBuPNRA D0027-003-009-008-001-BB026276
- Item
- undated
Part of Timothy Miller Collection
Great Northern Engineering Drawing: Design 62 Foot Through Plate Girder Span, Bridge 18.3 - Entiat River (Old), north of Wagnersburg, Washington, Line Segment 387, Milepost 18.3. Sheet 218 - 2565 - 12, undated.