Burlington Northern depot and water tank at Plymouth, Washington, August 1973.
Elements area
Taxonomy
Code
Scope note(s)
Source note(s)
Taken From list of SP&S Stations and Spurs.
Taken From list of SP&S Stations and Spurs.
Burlington Northern depot and water tank at Plymouth, Washington, August 1973.
Burlington Northern diesel locomotive 4194, formerly Northern Pacific 914, at Plymouth, Washington, on June 28, 1971. Number 4194 is an RS-11 built by American Locomotive Company (ALCO), builder's number 83584. Photo by J.M. Fredrickson. Other Subject Classes: diesel locomotive.
Fredrickson, James M.Plat Map of Spokane, Portland, and Seattle Railway facilities at Plymouth, Washington, July 27, 1953, Sheet Number 1, Line Segment 47, showing the Latah Junction-Portland line.
Plat Map of Spokane, Portland, and Seattle Railway facilities at Plymouth, Washington, July 27, 1953, Sheet Number 2, Line Segment 47, showing the Latah Junction-Portland line.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 396. Installation of water in stock yards at Plymouth, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 427. Correspondence File Number 330-9. Vancouver Division. Other subject categories: Plumbing Water Service.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 801. Constructing 2 story section house and replace, etc. at Plymouth, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 908. Correspondence File Number 330. Vancouver Division. Other subject categories: Structure Section House.
Spokane, Portland and Seattle Railway Engineering Drawing: Expansion Joint, Bridge 182.8 - Underpass, east of Plymouth, Washington, Line Segment 047, Milepost 194.83. Sheet JK - 337, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Footing/Wall Plan, Bridge 182.8 - Underpass, east of Plymouth, Washington, Line Segment 047, Milepost 192.80. Sheet ML - 192 - 8, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Relocation, Bridge 182.8 - Underpass, east of Plymouth, Washington, Line Segment 047, Milepost 192.80. Sheet ML - 192 - 8, 1949. Note: Concrete arch (relocation)
Spokane, Portland and Seattle Railway Engineering Drawing: Relocation, Bridge 182.8 - Underpass, east of Plymouth, Washington, Line Segment 047, Milepost 194.83. Sheet 1 - 0 - 7/29.2A, 1950.