Washington (State)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    Display note(s)

      Hierarchical terms

      Washington (State)

      Equivalent terms

      Washington (State)

      • UF Washington

      Associated terms

      Washington (State)

        67779 Archival description results for Washington (State)

        1749 results directly related Exclude narrower terms
        US WaBuPNRA D0261A-002-1902 · Item · 1917-04-10
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1902. Contribution to Lincoln County account moving county roard. Chief Engineer/Standard Maintenance Procedure AFE Number RW 41. Correspondence File Number 37-2. Vancouver Division. Other subject categories: Contribution.

        US WaBuPNRA D0261A-002-1382 · Item · 1916-01-14
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1382. Move present road crossing near George's Spur to a point 66 feet west of present location. All labor and material to be furnished by Washington State Highway Commission. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1483. Correspondence File Number 378-1. Vancouver Division. Other subject categories: Road Crossing.

        US WaBuPNRA D0261A-002-950 · Item · undated
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 950. Taking up and loading material on 405 foot spur - Four Lakes Lumber Company at Four Lakes, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1076. Correspondence File Number 401-1. Vancouver Division. Other subject categories: Tracks Spur.

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 712. Constructing right of way fence along land of H. Stuchek near Fountain, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 796. Correspondence File Number 13-1. Vancouver Division. Other subject categories: Fencing.

        US WaBuPNRA D0261A-002-1535 · Item · undated
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1535. Bonding rails at the interlocking plant at Fort Wright, Washington, account Great Northern Railway changing rail as per Great NorthernAFE 25855 and contract with SP&S of March 1, 1912. Work already done. Correspondence File Number 399. Vancouver Division. Other subject categories: Signals Bonding Rails.

        US WaBuPNRA D0261A-002-1681 · Item · 1916-12-02
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1681. Repair telegraph cable where damaged and place same in pipe for a distance of 150 foot at each end of tunnel No. 19 near Fort Wright, Washington. Vandals have damaged cable by gun shots. Repairs needed to put same in good order and additions needed to prevent future damages. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1751. Correspondence File Number 10-2. Vancouver Division. Other subject categories: Telegraph Cable.

        US WaBuPNRA D0261A-002-1903 · Item · 1917-05-11
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1903. Erect mail crane at Fisher. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1941. Correspondence File Number 362. Vancouver Division. Other subject categories: Mail Crane.

        US WaBuPNRA D0261A-002-1904 · Item · 1917-04-13
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1904. Remove crossing and close uo right of way fence just west of Fisher. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1942. Correspondence File Number 13-1. Vancouver Division. Other subject categories: Crossing Fencing.

        US WaBuPNRA D0261A-002-1416 · Item · 1916-02-26
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1416. Build spur track 360 feet long at Fisher, Washington, to provide facilities for handling carload shipments to this point. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1520. Correspondence File Number 362-1. Vancouver Division. Other subject categories: Tracks Spur.