Oregon

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    Display note(s)

      Hierarchical terms

      Oregon

      Equivalent terms

      Oregon

        Associated terms

        Oregon

          7484 Archival description results for Oregon

          192 results directly related Exclude narrower terms
          US WaBuPNRA D0261A-002-1346 · Item · 1915-12-17
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1346. Take up 2509 feet of track Astoria leg of wye and dismantle timber trestle bridge 407-3, 1737 feet at Willbridge. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1444. Correspondence File Number 34-13Y (?). Terminals Division. Other subject categories: Tracks Removal.

          US WaBuPNRA D0261A-002-1228 · Item · 1915-07-01
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1228. Constructing two tracks 380 feet long parallel to Balboa Street on property of Shell Oil Company at Willbridge, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1324. Correspondence File Number 367-1. Terminals Division. Other subject categories: Tracks Construction.

          US WaBuPNRA D0261A-002-1257 · Item · 1915-08-11
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1257. Replace one square with two skew bents near west end of trestle on Astoria leg of wye and building temporary bridge under west end of Portland leg of wye at Willbridge, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1357. Correspondence File Number 367-A. Terminals Division. Other subject categories: Bridge Bents.

          US WaBuPNRA D0261A-002-1262 · Item · 1915-08-14
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1262. Connect junction switch with switch lever in operators cabin at Willbridge, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1321. Correspondence File Number 367. Terminals Division. Other subject categories: Tracks Switch Lever.

          US WaBuPNRA D0261A-002-1419 · Item · 1916-03-06
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1419. Apply detector bars to switch and replace 66 feet of 72 pound rail with 85 pound rail and junction switch about 500 feet east of Willbridge, Oregon, to avoid the possibility of operator throwing switch under moving train. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1489. Correspondence File Number 367. Terminals Division. Other subject categories: Tracks Switch.

          US WaBuPNRA D0261A-002-1593 · Item · 1916-09-16
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1593. CREDIT - SP&S portion, two-thirds, of total consideration of $8990.50 received from Shell Company of California for tract of ground at Willbridge. Chief Engineer/Standard Maintenance Procedure AFE Number RW 35. Correspondence File Number 367-7SU. Terminals Division. Other subject categories: Property.

          US WaBuPNRA D0261A-002-1592 · Item · 1916-09-16
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1592. CREDIT - SP&S portion, two-thirds, of total consideration of $4226.60 received from Standard Oil Company for tract of ground at Willbridge. Chief Engineer/Standard Maintenance Procedure AFE Number RW 34. Correspondence File Number 367-7SU. Terminals Division. Other subject categories: Property.

          US WaBuPNRA D0261A-002-1917 · Item · 1917-04-19
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1917. Remove crossover west of west end of Willamette River Bridge. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1949. Correspondence File Number 367. Other subject categories: Tracks Crossover.

          US WaBuPNRA D0261A-002-1974 · Item · 1917-06-11
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1974. Build switchback connecting track. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1988. Correspondence File Number 367-1R. Other subject categories: Track Connecting.

          US WaBuPNRA D0261A-002-1932 · Item · undated
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1932. Built two watchmens shacks, one on each end of the bridge. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1961. Correspondence File Number 33-7. Other subject categories: Structure Watchmen.

          US WaBuPNRA D0261A-002-669 · Item · 1913-04-04
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 669. Constructing 300 foot spur track to serve W & O Timber Company at Woods Landing, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 724. Portland Division. Other subject categories: Tracks Spur.

          US WaBuPNRA D0261A-002-985 · Item · 1914-05-15
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 985. Taking up a 300 foot spur serving Columbia & Nehalem River Railroad at Woodson, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1114. Correspondence File Number A357-1. Portland Division. Other subject categories: Tracks Spur.

          US WaBuPNRA D0261A-002-249 · Item · undated
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 249. Ten, 3 pile dolphins at Youngs Bay Bridge, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 304. Correspondence File Number A33-Y. Portland Division. Other subject categories: Bridge Dolphins.

          US WaBuPNRA D0261A-002-638 · Item · 1913-02-22
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 638. Constructing 20,160 lineal feet of fence from Youngs Bay, Oregon to Skipanon, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 642. Correspondence File Number A-13. Portland Division. Other subject categories: Fencing.

          US WaBuPNRA D0261A-002-347 · Item · 1911-07-15
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 347. Putting longitudinal braces on 30 panels of trestle at Youngs Bay, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 416. Portland Division. Other subject categories: Bridge Trestle Repairs.