Prescott (Or.)

Taxonomy

Code

Scope note(s)

Source note(s)

Display note(s)

Hierarchical terms

Prescott (Or.)

BT Oregon

Prescott (Or.)

Equivalent terms

Prescott (Or.)

Associated terms

Prescott (Or.)

5 Archival description results for Prescott (Or.)

5 results directly related Exclude narrower terms

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Prescott, Oregon, 1914.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 892. Constructing pig proof fence for R.H. Graham at Prescott, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1019. Correspondence File Number A34. Portland Division. Other subject categories: Fencing.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Prescott, Oregon, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1476. Erect a standard 10 foot by 24 foot shelter shed at Prescott, Oregon to provide facilities for traveling public. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1560. Correspondence File Number A352. Portland Division. Other subject categories: Structure Shelter Shed.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Prescott, Oregon, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1921. Install whistle posts on each side of crossing. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1953. Correspondence File Number A352-4. Other subject categories: Signs Whistle Posts.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Prescott, Oregon, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1470. Fill bridge A-43-0, located 0.5 miles west of Prescott, Oregon; also construct 42 inch cast iron pipe culvert 60 feet long. Length of trestle 302 feet. Necessary to fill or renew trestle. Work provided for by 1916 budget. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1558. Correspondence File Number A34-3. Portland Division. Other subject categories: Bridge Filling.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Prescott, Oregon, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1469. Fill 594 lineal feet and renew with standard pile trestle 110 lineal feet of bridge A-42-7, located 0.2 miles west of Prescott, Oregon. Material for filling to be obtained from borrow pit at side of trestle. Present length of trestle 704 feet. Necessary to fill or renew trestle. Work provided for by 1916 budget. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1557. Correspondence File Number A34-3. Portland Division. Other subject categories: Bridge Filling.