Oregon

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    Display note(s)

      Hierarchical terms

      Oregon

      Equivalent terms

      Oregon

        Associated terms

        Oregon

          7346 Archival description results for Oregon

          192 results directly related Exclude narrower terms
          US WaBuPNRA D0261A-002-1792 · Item · 1917-02-13
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1792. Install shelving on the west wall of room 827, Pittock Block, for the Car Service Department, to provide storage space for records. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1842. Correspondence File Number 368-CT. Terminal Division. Other subject categories: Furniture .

          US WaBuPNRA D0261A-002-1795 · Item · 1917-02-13
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1795. Renew frog crossing Northern Pacific Terminal Spur to Pacific Stoneware Company plant. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1847. Correspondence File Number 368-4. Terminal Division. Other subject categories: Crossing Frog.

          US WaBuPNRA D0261A-002-1479 · Item · 1916-04-21
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1479. Payment of special street assessment account improvement Columbia Boulevard from Edwards Street to west end of bridge over SP&S cut by constructing sidewalks, etc. Improvement ordered by City Council of Portland and work done by contract and cost assessed against abutting property. Sidewalk furnishes means to get from St. Johns-Portland car line to East St. Johns depot of SP&S. Chief Engineer/Standard Maintenance Procedure AFE Number RW T75. Correspondence File Number 368-X. Terminals Division. Other subject categories: Assessment Sidewalks.

          US WaBuPNRA D0261A-002-1620 · Item · 1916-10-21
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1620. CREDIT - Take up 30 feet of track and crossing from old Martin Dock spur in Portland yard to avoid maintenance charges on portion of street occupied by this track. No use for this track which lay in Front Street. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1694. Correspondence File Number 368-D. Terminals Division. Other subject categories: Track Removal.

          US WaBuPNRA D0261A-002-1640 · Item · 1916-11-03
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1640. Make one two-section filing cabinet similar to one now in use in Traffic Department to care for steamer and rail loose leaf tariffs which require pigeon holes for each leaf. Correspondence File Number 368-CT. Terminals Division. Other subject categories: Furniture.

          US WaBuPNRA D0261A-002-1663 · Item · 1916-11-29
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1663. Install 3 standard Impaired Clearance posts, 21st Street, Portland, Oregon to Willbridge, Oregon, to comply with Order No. 99 of Public Service Commission of Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1723. Correspondence File Number 47-1. Terminals Division. Other subject categories: Signs Clearance .

          US WaBuPNRA D0261A-002-1514 · Item · 1916-05-29
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1514. Install two fireproof doors and additional shelving and change the location of two lights in the vault used by the Accounting Department on the second floor of the east freight House at eleventh and Hoyt Streets, Portland, Oregon, to furnish more room for records and provide ventilation. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1591. Correspondence File Number 368-77. Terminals Division. Other subject categories: Furniture.

          US WaBuPNRA D0261A-002-1584 · Item · 1916-09-06
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1584. Build new partition in room now occupied by Master Carpenter and Roadmaster and move case in Superintendent's office in West Freight Shed, Portland, Oregon, to provide additional space for Valuation Bureau on account of arrival of ICC Federal Valuation parties. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1670. Correspondence File Number 368-77. Terminals Division. Other subject categories: Structure Office.

          US WaBuPNRA D0261A-002-1659 · Item · 1916-11-28
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1659. Install a spout on the water tank in the Portland yard to provide an auxiliary water supply for engines while stand pipe is being repaired. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1728. Correspondence File Number 368-9. Terminals Division. Other subject categories: Water Supply.

          US WaBuPNRA D0261A-002-1403 · Item · 1916-02-14
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1403. Build shelving, rearrange present lights and install additional lights in office of Valuation Department at West Freight House, Portland, to provide office facilities for use in preparing data for Federal Valuation of Railroads. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1511. Correspondence File Number 368-77. Terminals Division. Other subject categories: Furniture Shelving.

          US WaBuPNRA D0261A-002-1420 · Item · 1916-03-06
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1420. To cover this Company's one-half interest in spur track to serve warehouse belonging to D.P. Thompson Company on Lots 5 and 8, Block 121, Couch's Addition, Portland. Necessary to provide track to serve this industry and comply with conditions of contract between the D.P. Thompson Company, the Northern Pacific Terminal Company, and SP&S dated August 24, 1915. Work already done. Cost of spur $566.87, this company's proportion $282.43, Expense borne by D.P. Thompson Company. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1525. Correspondence File Number 368-1Q. Terminals Division. Other subject categories: Tracks Spur.

          US WaBuPNRA D0261A-002-1646 · Item · 1916-11-29
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1646. Place four dozen Saxon Guards on the electric light bulbs at "North Bank" dock, Portland, Oregon, to protect light bulbs and prevent same from being stolen. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1639. Correspondence File Number 368-W. Terminals Division. Other subject categories: Lighting.

          US WaBuPNRA D0261A-002-1661 · Item · 1916-11-28
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1661. Installation of electric lights in in record room for Mr. Turner's office in the east shed, Portland terminal, to facilitate the handling of records in the record room. Chief Engineer/Standard Maintenance Procedure AFE Number SMP 197. Correspondence File Number 368-28. Terminals Division. Other subject categories: Lighting.

          US WaBuPNRA D0261A-002-1713 · Item · 1916-12-22
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1713. Place additional valves in steam line in Portland yard so that repairs could in the future be made in parts of the heating system without shutting off heat from all parts of the system. Work was done when pipes were dug up this year. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1790. Correspondence File Number 368-21. Terminal Division. Other subject categories: Plumbing Steam Heat.

          US WaBuPNRA D0261A-002-1719 · Item · 1916-12-27
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1719. Replace culvert No. A-6-61 with 50' of 24" concrete pipe, expense to be paid by the Port of Portland as per agreement account present culvert having been covered by the Port of Portland in their dredging operations. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1787. Correspondence File Number A50. Portland Division. Other subject categories: Culverts.

          US WaBuPNRA D0261A-002-1590 · Item · 1916-09-16
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1590. Throw track No. 6, taking up 70 feet from end of same; cut coal bin to provide space for building; move box car bodies and build 22 foot by 380 foot shelter shed, all in Portland Yard, to provide shelter for car repairers. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1676. Correspondence File Number 368-CS. Terminals Division. Other subject categories: Track Adjustment.

          US WaBuPNRA D0261A-002-1693 · Item · 1916-12-01
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1693. Installing an additional lower arm on present semaphore at City Limits, to control train movements from Hoyt Street depot while present one controls movements from Union Depot. The additional arm is required in order to provide for safe operation on account of present signal controlling two movements. Chief Engineer/Standard Maintenance Procedure AFE Number SMP 182 . Correspondence File Number 6-0343. Terminal Division. Other subject categories: Signals Semaphore.

          US WaBuPNRA D0261A-002-1704 · Item · 1916-12-19
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1704. Extend the platform along track No. 6 of the passenger yard 200 foot, Portland, Oregon, to allow baggage, mail and express to be unloaded on opposite side of the train from passengers to lessen the liability of accident. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1789. Correspondence File Number 368. Terminal Division. Other subject categories: Platform Depot.

          US WaBuPNRA D0261A-002-1219 · Item · 1915-06-21
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1219. Building concrete sidewalk on Thurman Street along lot 1, Block 17, Watsons addition at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1315. Correspondence File Number 368-X. Terminals Division. Other subject categories: Sidewalk.

          US WaBuPNRA D0261A-002-1285 · Item · 1915-09-23
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1285. Install three electric lights in Roadmaster's office, Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1389. Correspondence File Number 368-28. Terminals Division. Other subject categories: Lighting.

          US WaBuPNRA D0261A-002-1340 · Item · 1915-12-17
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1340. Provide crushed rock for macadamizing portion of 17th Street at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1443. Correspondence File Number 368-X. Terminals Division. Other subject categories: Road Gravel.

          US WaBuPNRA D0261A-002-1347 · Item · 1915-12-22
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1347. Move building from 17th and Upshur to point near coal bunkers in Portland Yard. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1435. Correspondence File Number 368-77. Terminals Division. Other subject categories: Structure Moving.

          US WaBuPNRA D0261A-002-1177 · Item · 1915-04-20
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1177. Renewing crossing on Wiedler Dock lead and American Can Company Spur at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1280. Correspondence File Number 368-4. Terminals Division. Other subject categories: Road Crossing.

          US WaBuPNRA D0261A-002-1178 · Item · 1915-04-20
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1178. Filling old highway bridge on 17th Street between Vaughn and Front Street at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1281. Correspondence File Number 368. Terminals Division. Other subject categories: Bridge Filling.

          US WaBuPNRA D0261A-002-1194 · Item · 1915-05-19
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1194. Building concrete sidewalk along lot 14, Block 29 at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1295. Correspondence File Number 368-X. Terminals Division. Other subject categories: Sidewalk.

          US WaBuPNRA D0261A-002-1216 · Item · 1915-06-15
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1216. Renewal of worn out piles, bracing, caps, etc. at North Bank Dock and placing additional pieces at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1310. Correspondence File Number 368-W. Terminals Division. Other subject categories: Dock .

          US WaBuPNRA D0261A-002-1291 · Item · 1915-10-5
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1291. Build 296 foot spur track near Roosevelt and 20th Streets in Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1394. Correspondence File Number 368-1?. Terminals Division. Other subject categories: Tracks Spur.

          US WaBuPNRA D0261A-002-1290 · Item · 1915-10-4
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1290. Tear out old counter and build new on in Treasurer's office at 11th and Hoyt Street at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1395. Correspondence File Number 368-77. Terminals Division. Other subject categories: Structure Office.

          US WaBuPNRA D0261A-002-1329 · Item · 1915-12-08
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1329. Replace 327 feet of 50 pound rail with 75 pound rail, 11th and Hoyt Street Station at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1426. Correspondence File Number 368-2. Terminals Division. Other subject categories: Tracks Rail Replacement.

          US WaBuPNRA D0261A-002-1332 · Item · 1915-12-11
          Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

          Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1332. Replace split switch with special double tongue switch at Front Street, Broadway Bridge at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1433. Correspondence File Number 368-75. Terminals Division. Other subject categories: Tracks Switch.