Snake River (Wash.)

Taxonomy

Code

Scope note(s)

Source note(s)

  • Taken From: "List of Officers, Agents, Stations, Etc. Number 44" published by the NP Accounting Department.

Display note(s)

Hierarchical terms

Snake River (Wash.)

Snake River (Wash.)

Equivalent terms

Snake River (Wash.)

Associated terms

Snake River (Wash.)

6 Archival description results for Snake River (Wash.)

6 results directly related Exclude narrower terms

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Snake River, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1523. Take out the turnout and 110 lineal feet of track at the east end and 483 feet of track at west end of the Wall track and build a spur 688 feet long in the opposite direction and take up 30 feet of the west end of the concrete depot platform at Snake River, to furnish facilities for the Farmers Union elevator in order to compete with the O-WRR&N Company on grain shipments. Correspondence File Number 317-1. Vancouver Division. Other subject categories: Track Removal.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Snake River, Washington, 1911.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 316. Widening cut at Snake River Cut, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 370. Vancouver Division. Other subject categories: Trackage Cut.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Snake River, Washington, 1910.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 244. Undercrossing for B.V.A E.C. Sedell at Snake River, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 295. Correspondence File Number 60-7. Vancouver Division. Other subject categories: Road Undercrossing.

Great Northern Railway Authorization for Expenditure (AFE) 6479, Snake River, Washington, 1938.

AFE 6479, Snake River, Washington, 1938. Make Certain Repairs and Additions to Property in Cloud Burst Territory to Allow Quick and Safe Runoff of Rainwater. Place Additonal Culverts, Riprap, and Ditches at Various Points. Interstate Commerce Commission Account Number 3 Grading Cost: $12410. Series . Lines West. Other Subject Categories: Track Maintenance, Grading and Embankment

Great Northern Railway Authorization for Expenditure (AFE) 6400, Snake River, Washington, 1938.

AFE 6400, Snake River, Washington, 1938. Change Main Line in Vicinity of Mp 260, Throwing It Away From Bluff and Comb Down Loose and Threatening Rocks on Bluffs Along Side Main Line, Hauling Rock Away to Suitable Disposal Point, in Vicinity of Snake River, Wash. Interstate Commerce Commission Account Number 12 Track Laying and Surfacing Cost: $15000. Series . Lines West. Other Subject Categories: Track, Mainline