Railroads--Management

Elements area

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

    Hierarchical terms

    Railroads--Management

    Equivalent terms

    Railroads--Management

    • UF Railroad project documents

    • UF Authorization documents

    Associated terms

    Railroads--Management

      21 Archival description results for Railroads--Management

      21 results directly related Exclude narrower terms
      US WaBuPNRA D0261A-002-1958 · Item · 1917-05-23
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1958. Purchase of property from G.W. Bassett and wife. Chief Engineer/Standard Maintenance Procedure AFE Number RW 43. Correspondence File Number 313-7. Other subject categories: Property.

      US WaBuPNRA D0261A-002-1755 · Item · 1917-01-19
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1755. partition off a 12 foot x 14 foot room from freightroom for use of agent at Washtucna, Washington. Agent agrees to bear entire expense at rate of $2.00 per month. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1814. Correspondence File Number 313. Vancouver Division. Other subject categories: Structures Living Quarters.

      US WaBuPNRA D0261A-002-1698 · Item · 1916-12-13
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1698. Extend the spur track at Washtucna, Washington, 350 foot to serve the Standard Oil Company. Work to be done according to standard sidetrack agreement. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1737 (?). Correspondence File Number 313-1. Vancouver Division. Other subject categories: Track Spur.

      US WaBuPNRA D0261A-002-1715 · Item · 1916-12-27
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1715. Load and haul gravel for road at Washtucna, Washington. This work done on understanding with Commercial Club to effect that they would arrange to unload and spread same. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1769. Correspondence File Number 313. Vancouver Division. Other subject categories: Hauling Gravel.

      US WaBuPNRA D0261A-002-1156 · Item · 1915-04-02
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1156. Extension 40 feet by 44 feet to rear of present stockyard at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1268. Correspondence File Number 313. Vancouver Division. Other subject categories: Structure Stock Yard.

      US WaBuPNRA D0261A-002-969 · Item · 1914-04-15
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 969. Repairs to bridge 291-4 at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1099. Correspondence File Number 34-2. Vancouver Division. Other subject categories: Bridge Repairing.

      US WaBuPNRA D0261A-002-765 · Item · 1913-08-05
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 765. Replacement of trestle at bridge 291-4 with steel and concrete at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 816. Correspondence File Number 33-2OB. Vancouver Division. Other subject categories: Trestle Replacing.

      US WaBuPNRA D0261A-002-313 · Item · 1911-06-01
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 313. Grading of crossing on industrial spur at Canal Street at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 376. Correspondence File Number 313-1. Vancouver Division. Other subject categories: Road Crossing.

      US WaBuPNRA D0261A-002-260 · Item · 1911-01-20
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 260. Installing air sand hoist at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 317. Correspondence File Number 313-3. Vancouver Division. Other subject categories: Structure Sand Hoist.