  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

Hierarchical terms

Railroads--Management

Equivalent terms

Railroads--Management

  • UF Railroad project documents
  • UF Authorization documents

Associated terms

Railroads--Management

21 Archival description results for Railroads--Management

21 results directly related Exclude narrower terms

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Lamont, Washington and Washtucna, Washington, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1271. Place scrap rail for grate bar in coal pockets at Lamont, Washington and Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1367. Correspondence File Number 38-2. Vancouver Division. Other subject categories: Structure Coal Pockets.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna (near), Washington, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1766. Renew with standard frame trestle bridge No. 288-9, located 2.1 miles west of Washtucna, Washington, extending each end 8 feet to do away with high bulkheads. Present length of trestle 115 feet. Proposed length 131 feet. Necessary to renew trestle. Work provided for by 1917 work sheet. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1828. Correspondence File Number 34-27. Vancouver Division. Other subject categories: Bridge.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna (near), Washington, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1772. Renew with standard frame trestle bridge No. 290-4, located 0.4mile west of Washtucna, Washington, extending each end 6 feet to do away with high bulkheads. Also renew standard sidewalk on one side. Present length of trestle 192 foot Proposed length 204 foot work provided for by 1917 work sheet. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1829. Correspondence File Number 34-27. Vancouver Division. Other subject categories: Bridge Renewal.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington and Glavin, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1483. CREDIT - Take up 13,854 lineal feet of 85 pound rail on the warehouse spur at Washtucna, Washington, and replace with 60 pound and 66 pound rail from the Glavin borrow pit, account contractors releasing rail in Glavin pit and the 85 pound rail is needed for emergency use on the main line. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1573. Correspondence File Number 33-1. Vancouver Division. Other subject categories: Tracks Rail Replacement.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1909.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 34. Construct warehouse spur at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 41. Correspondence File Number 313-1. Vancouver Division. Other subject categories: Tracks Spur.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1910.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 208. Switching spur at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 260. Correspondence File Number 303-1. Vancouver Division. Other subject categories: Tracks Spur.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1910.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 237. Siding at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 286. Correspondence File Number 313. Vancouver Division. Other subject categories: Tracks Siding.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1911.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 266. Building bridge on spur track and rebuilding of 1075 feet of ditch at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 323. Correspondence File Number 313-7P. Vancouver Division. Other subject categories: Bridge Construction.