Prosper (N.D.)

Taxonomy

Source note(s)

Hierarchical terms

Prosper (N.D.)

8 Archival description results for Prosper (N.D.)

8 results directly related Exclude narrower terms

Great Northern Railway Authorization for Expenditure (AFE) 35721, Prosper, North Dakota, 1927.

AFE 35721, Prosper, North Dakota, 1927. Removing Pressent 12'X14' Pump House, 8 H.P. Combined Engine and Pump and 400 Gallon Fuel Tank (Engine and Pump and Fuel Tank to Be Placed at Harwood, North Dakota} at Prosper, North Dakota. Interstate Commerce ... »

Great Northern Railway Authorization for Expenditure (AFE) 38668, Prosper, North Dakota, 1928.

AFE 38668, Prosper, North Dakota, 1928. Pile Bridge No. 10.1 - 168 Ft Loing, 8 1/2 Ft High, Over Overflow Channel of Maple River E. of Prosper, North Dakota.
Replace with Concrete Trestle (Cap. Type), 180 Feet Long. Raise Grade 2 1/2 Feet. Interstate ... »

Great Northern Railway Authorization for Expenditure (AFE) 38670, Fargo, North Dakota, 1928.

AFE 38670, Fargo, North Dakota, 1928. Bridge No 2.3 Over Head Ditch No 5 and Cattle Pass, Near Fargo, North Dakota, (2.3 Miles West) Pile Trestle 56 Ft Long, 10 Ft High
Replace with 48 FeetCconcrete Trestle, Cap Type, Raise Grade 2 1/2 Feet.
Bridge No 5.2 ... »

Great Northern Railway Authorization for Expenditure (AFE) 4095, Prosper, North Dakota, 1916.

AFE 4095, Prosper, North Dakota, 1916. Transfer One Flat Top Station Desk From Prosper to Arthur. Interstate Commerce Commission Account Number 16 Station and Office Buildings Cost: $0. Series II. Lines East. Breckenridge Division. Other Subject ... »

Great Northern Railway Authorization for Expenditure (AFE) 78498, Prosper, North Dakota, 1948.

AFE 78498, Prosper, North Dakota, 1948. Fargo to Prosper, N.D.- Relay with115# Rail, 8.01 Miles of Main L Ine Line and Three Turnouts. Interstate Commerce Commission Account Number 9, Rails. Cost: $311500. Series II. Lines East. Other Subject ... »