Wisconsin

Taxonomy

Code

Scope note(s)

Source note(s)

Display note(s)

Hierarchical terms

Wisconsin

Equivalent terms

Wisconsin

Associated terms

Wisconsin

5518 Archival description results for Wisconsin

81 results directly related Exclude narrower terms

Great Northern Railway Authorization for Expenditure (AFE) 10301, Louisberg, Wisconsin, 1919.

AFE 10301, Louisberg, Wisconsin, 1919. Relaying Present 60# Rail (New When Laid in 1887) with Secondhand 75#/96 Rail From Sta.1099+66 West End of Present 75# Rail West of Appleton to Sta. 1568+30.5 East Switch Louisburg, A Distance of 8.86 Miles. Providing New Angle Bars, Bolts and Spikes and Tie Plates. Placing 4530 Additional Space Ties and Substituting #9 Spring Rail Frogs for Present Rigid Frogs. Placing 14000 Cubic Yards.of Ballast and 15000 Cu. Yd. Bankwidening. Build Standard Rail Block, Hand Car Rest and Sign Mound. Appleton to Louisberg. Interstate Commerce Commission Account Number 9 Rails Cost: $99210. Series II. Lines East. Other Subject Categories: Track Maintenance, Rail

Great Northern Railway Authorization for Expenditure (AFE) 10301, Appleton, Wisconsin, 1919.

AFE 10301, Appleton, Wisconsin, 1919. Relaying Present 60# Rail (New When Laid in 1887) with Secondhand 75#/96 Rail From Sta.1099+66 West End of Present 75# Rail West of Appleton to Sta. 1568+30.5 East Switch Louisburg, A Distance of 8.86 Miles. Providing New Angle Bars, Bolts and Spikes and Tie Plates. Placing 4530 Additional Space Ties and Substituting #9 Spring Rail Frogs for Present Rigid Frogs. Placing 14000 Cubic Yards.of Ballast and 15000 Cu. Yd. Bankwidening. Build Standard Rail Block, Hand Car Rest and Sign Mound. Appleton to Louisberg. Interstate Commerce Commission Account Number 9 Rails Cost: $99210. Series II. Lines East. Other Subject Categories: Track Maintenance, Rail

Great Northern Railway Authorization for Expenditure (AFE) 10259, Saunders, Wisconsin, 1919.

AFE 10259, Saunders, Wisconsin, 1919. Relaying Present 60#, 75#, 77 1/2# and 85# Material in Ladder Track and Turnouts, Within Limits of Interlocking Plant, with 90# Material Changing #7 Frogs and Turnouts to #9 Frogs and Turnouts. Interstate Commerce Commission Account Number 9 Rails Cost: $1900. Series II. Lines East. Mesabi Division. Other Subject Categories: Track Maintenance, Rail

Great Northern Railway Authorization for Expenditure (AFE) 10258, Saunders, Wisconsin, 1919.

AFE 10258, Saunders, Wisconsin, 1919. Relay Track and Turnouts Within The Limits of The Interlocking Plant with 90# Rail. Interstate Commerce Commission Account Number 10 Other Track Material Cost: $9750. Series II. Lines East. Superior Division. Other Subject Categories: Track, Yards,

Great Northern Railway Authorization for Expenditure (AFE) 10239, State Line Tower, Wisconsin, 1918.

AFE 10239, State Line Tower, Wisconsin, 1918. Remove Crossover to Helper Spur 236 Feet Long, Station 93+85 to Station 96+21. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $-596. Series II. Lines East. Mesabi Division. Other Subject Categories: Track, Other

Results 5471 to 5480 of 5518