Railroads--Management

Elements area

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

    Hierarchical terms

    Railroads--Management

    Equivalent terms

    Railroads--Management

    • UF Railroad project documents

    • UF Authorization documents

    Associated terms

    Railroads--Management

      152868 Archival description results for Railroads--Management

      152866 results directly related Exclude narrower terms
      US WaBuPNRA D0261A-002-368 · Item · 1911-08-11
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 368. Piping two drop pits at roundhouse at Lamont, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number SMP 16. Correspondence File Number 6-0041; 307-3. Vancouver Division. Other subject categories: Plumbing Piping.

      US WaBuPNRA D0261A-002-228 · Item · 1910-10-19
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 228. Installing steam heat in oil house, store house, and roundhouse at Lamont, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 285. Correspondence File Number 6-0010; 307-3. Vancouver Division. Other subject categories: Plumbing Steam Heat.

      US WaBuPNRA D0261A-002-231 · Item · 1910-10-19
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 231. Platform from machine shop to oil and store hose at Lamont, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 284. Correspondence File Number 307-8. Vancouver Division. Other subject categories: Structure Platform.

      US WaBuPNRA D0261A-002-1271 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1271. Place scrap rail for grate bar in coal pockets at Lamont, Washington and Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1367. Correspondence File Number 38-2. Vancouver Division. Other subject categories: Structure Coal Pockets.

      US WaBuPNRA D0261A-002-1679 · Item · 1916-12-04
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1679. CREDIT - Remove 125-ton Fairbanks-Morse track scales at Lamont, Washington and ship to Bend, Oregon and plank over scale pit at Lamont, account scales not used at Lamont and needed in Bend. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1745. Correspondence File Number 307-6. Vancouver Division. Other subject categories: Scales Track.

      US WaBuPNRA D0261A-002-1789 · Item · 1917-02-13
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1789. Place tieplates on turnouts at both ends of side track at Knappa, Oregon, for safety, to keep track from sreading. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1839. Correspondence File Number A325. Portland Division. Other subject categories: Track Tie Plates.

      US WaBuPNRA D0261A-002-1843 · Item · 1917-02-27
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1843. Build 12' x 32' depot and 8' x 12' platform. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1895. Correspondence File Number A325. Portland Division. Other subject categories: Structure Depot Platform.

      US WaBuPNRA D0261A-002-890 · Item · 1914-01-20
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 890. Raising grade of driveway near tracks at Knappa, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 994. Correspondence File Number A325. Portland Division. Other subject categories: Road Driveway.

      US WaBuPNRA D0261A-002-659 · Item · 1913-03-24
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 659. Connecting passing track with Crossett Lumber Company at Knappa, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 669. Correspondence File Number A325-A. Portland Division. Other subject categories: Tracks Passing.

      US WaBuPNRA D0261A-002-685 · Item · 1913-04-29
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 685. Extending station platform and building privy at Knappa, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 763. Portland Division. Other subject categories: Structure Platform.

      US WaBuPNRA D0261A-002-1328 · Item · 1915-12-07
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1328. Construct 48 inch concrete culvert and fill bridge A-88-5, 1.9 miles west of Knappa, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1422. Correspondence File Number A34-3H. Portland Division. Other subject categories: Culvert.

      US WaBuPNRA D0261A-002-1567 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1567. Renew 4.5 foot by 4.5 foot by 71 foot wood box culvert No. T-14-07 located three miles east of Kloan, Oregon, on Oregon Trunk Railway, with 64 lineal feet of 30 inch diameter concrete pipe. Culvert damaged by fire August 8th and must be renewed to maintain proper provision for drainage and prevent settlement of roadbed. Oregon Trunk Division. Other subject categories: Culvert.

      US WaBuPNRA D0261A-002-1988 · Item · 1917-06-22
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1988. Make connection to Klickitat Northern Railway and construct depot. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1972. Correspondence File Number 371. Vancouver - Goldendale Branch Division. Other subject categories: Connection Railroad.

      US WaBuPNRA D0261A-002-1154 · Item · 1915-04-01
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1154. Constructing spur track to serve E.H. Moorehouse at Klickitat, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1270. Correspondence File Number 371-1. Vancouver - Goldendale Branch Division. Other subject categories: Tracks Spur.

      US WaBuPNRA D0261A-002-1189 · Item · 1915-05-11
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1189. Installing standard cattle guard at west switch at Klickitat, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1292. Correspondence File Number 371. Vancouver - Goldendale Branch Division. Other subject categories: Tracks Cattle Guard.

      US WaBuPNRA D0261A-002-1287 · Item · 1915-09-28
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1287. Construct connecting tracks with tracks of Bennett Logging Company at Klickitat, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1393. Correspondence File Number 371-1. Vancouver - Goldendale Branch Division. Other subject categories: Tracks Connecting.

      US WaBuPNRA D0261A-002-1827 · Item · 1917-02-23
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1827. Renew bridge A-69-9 with standard pile trestle. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1873. Correspondence File Number A34-7. Portland Division. Other subject categories: Bridge Trestle.

      US WaBuPNRA D0261A-002-1989 · Item · 1917-06-25
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1989. Install mail crane. Chief Engineer/Standard Maintenance Procedure AFE Number CE 2007. Correspondence File Number A358. Portland Division. Other subject categories: Mail Crane.

      US WaBuPNRA D0261A-002-72 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 72. 80 foot extension on each end of depot platform at Kennewick, Washington. Correspondence File Number 323. Vancouver Division. Other subject categories: Platform.

      US WaBuPNRA D0261A-002-1621 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1621. Install temporary crossover between main line and passing track at Kennewick, Washington, and removing same after it has served its purpose, account necessary to provide greater clearance at bridge pier which O-WRR&N Company will build in bridge No. 228-4 during construction period. Total amount is to be paid by the General Construction Company, as per their letter to A.M. Lapfer dated October 3, 1916. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1696. Correspondence File Number 69-4. Vancouver Division. Other subject categories: Track Crossover.

      US WaBuPNRA D0261A-002-100 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 100. 309 foot spur track for Eschbach-Bruce Company at Kennewick, Washington. Correspondence File Number 323-1. Vancouver Division. Other subject categories: Tracks Spur.

      US WaBuPNRA D0261A-002-876 · Item · 1914-01-05
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 876. Relocating North Coast Railroad line and separation of grade at Kennewick, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 958. Correspondence File Number 69-4. Vancouver Division. Other subject categories: Tracks relocating.

      US WaBuPNRA D0261A-002-767 · Item · 1913-08-05
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 767. Grade crossing at 5th Avenue, making 24 foot roadway at Kennewick, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 789. Correspondence File Number 323-4. Vancouver Division. Other subject categories: Crossing.

      US WaBuPNRA D0261A-002-291 · Item · 1911-04-13
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 291. Construction of right of way fence for property of G.E. Edwards at Kennewick, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 350. Correspondence File Number 13-1. Vancouver Division. Other subject categories: Fencing.

      US WaBuPNRA D0261A-002-82 · Item · 1909-09-18
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 82. 4000 foot passing track at Kennewick, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 85. Correspondence File Number 323. Vancouver Division. Other subject categories: Tracks Passing.