Railroads--Management

Elements area

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

    Hierarchical terms

    Railroads--Management

    Equivalent terms

    Railroads--Management

    • UF Railroad project documents

    • UF Authorization documents

    Associated terms

    Railroads--Management

      152868 Archival description results for Railroads--Management

      152866 results directly related Exclude narrower terms
      US WaBuPNRA D0261A-002-1590 · Item · 1916-09-16
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1590. Throw track No. 6, taking up 70 feet from end of same; cut coal bin to provide space for building; move box car bodies and build 22 foot by 380 foot shelter shed, all in Portland Yard, to provide shelter for car repairers. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1676. Correspondence File Number 368-CS. Terminals Division. Other subject categories: Track Adjustment.

      US WaBuPNRA D0261A-002-1693 · Item · 1916-12-01
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1693. Installing an additional lower arm on present semaphore at City Limits, to control train movements from Hoyt Street depot while present one controls movements from Union Depot. The additional arm is required in order to provide for safe operation on account of present signal controlling two movements. Chief Engineer/Standard Maintenance Procedure AFE Number SMP 182 . Correspondence File Number 6-0343. Terminal Division. Other subject categories: Signals Semaphore.

      US WaBuPNRA D0261A-002-1704 · Item · 1916-12-19
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1704. Extend the platform along track No. 6 of the passenger yard 200 foot, Portland, Oregon, to allow baggage, mail and express to be unloaded on opposite side of the train from passengers to lessen the liability of accident. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1789. Correspondence File Number 368. Terminal Division. Other subject categories: Platform Depot.

      US WaBuPNRA D0261A-002-1219 · Item · 1915-06-21
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1219. Building concrete sidewalk on Thurman Street along lot 1, Block 17, Watsons addition at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1315. Correspondence File Number 368-X. Terminals Division. Other subject categories: Sidewalk.

      US WaBuPNRA D0261A-002-1285 · Item · 1915-09-23
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1285. Install three electric lights in Roadmaster's office, Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1389. Correspondence File Number 368-28. Terminals Division. Other subject categories: Lighting.

      US WaBuPNRA D0261A-002-1340 · Item · 1915-12-17
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1340. Provide crushed rock for macadamizing portion of 17th Street at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1443. Correspondence File Number 368-X. Terminals Division. Other subject categories: Road Gravel.

      US WaBuPNRA D0261A-002-1347 · Item · 1915-12-22
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1347. Move building from 17th and Upshur to point near coal bunkers in Portland Yard. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1435. Correspondence File Number 368-77. Terminals Division. Other subject categories: Structure Moving.

      US WaBuPNRA D0261A-002-1177 · Item · 1915-04-20
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1177. Renewing crossing on Wiedler Dock lead and American Can Company Spur at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1280. Correspondence File Number 368-4. Terminals Division. Other subject categories: Road Crossing.

      US WaBuPNRA D0261A-002-1178 · Item · 1915-04-20
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1178. Filling old highway bridge on 17th Street between Vaughn and Front Street at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1281. Correspondence File Number 368. Terminals Division. Other subject categories: Bridge Filling.

      US WaBuPNRA D0261A-002-1194 · Item · 1915-05-19
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1194. Building concrete sidewalk along lot 14, Block 29 at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1295. Correspondence File Number 368-X. Terminals Division. Other subject categories: Sidewalk.

      US WaBuPNRA D0261A-002-1216 · Item · 1915-06-15
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1216. Renewal of worn out piles, bracing, caps, etc. at North Bank Dock and placing additional pieces at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1310. Correspondence File Number 368-W. Terminals Division. Other subject categories: Dock .

      US WaBuPNRA D0261A-002-1291 · Item · 1915-10-5
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1291. Build 296 foot spur track near Roosevelt and 20th Streets in Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1394. Correspondence File Number 368-1?. Terminals Division. Other subject categories: Tracks Spur.

      US WaBuPNRA D0261A-002-1290 · Item · 1915-10-4
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1290. Tear out old counter and build new on in Treasurer's office at 11th and Hoyt Street at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1395. Correspondence File Number 368-77. Terminals Division. Other subject categories: Structure Office.

      US WaBuPNRA D0261A-002-1329 · Item · 1915-12-08
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1329. Replace 327 feet of 50 pound rail with 75 pound rail, 11th and Hoyt Street Station at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1426. Correspondence File Number 368-2. Terminals Division. Other subject categories: Tracks Rail Replacement.

      US WaBuPNRA D0261A-002-1332 · Item · 1915-12-11
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1332. Replace split switch with special double tongue switch at Front Street, Broadway Bridge at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1433. Correspondence File Number 368-75. Terminals Division. Other subject categories: Tracks Switch.

      US WaBuPNRA D0261A-002-1342 · Item · 1915-12-17
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1342. Put in additional shelving in room 606, Pittock Block in Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1447. Correspondence File Number 368-CT. Terminals Division. Other subject categories: Furniture Shelving.

      US WaBuPNRA D0261A-002-1171 · Item · 1915-04-15
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1171. Constructing on tail track and extending tail track. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1271. Correspondence File Number 368-2. Terminals Division. Other subject categories: Tracks Tail.

      US WaBuPNRA D0261A-002-1212 · Item · 1915-06-16
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1212. Constructing 430 foot spur for Standard Brick & Tile Company in block 29, Blackstone's Addition at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1309. Correspondence File Number 368-1SB. Terminals Division. Other subject categories: Tracks Spur.

      US WaBuPNRA D0261A-002-1313 · Item · 1915-11-13
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1313. Construct shelving in Valuation Department and Comptrollers office at 11th and Hoyt Street at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1416. Correspondence File Number 368-77. Terminals Division. Other subject categories: Furniture Shelving.

      US WaBuPNRA D0261A-002-1316 · Item · 1915-11-23
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1316. Construct two tracks 100 feet long and 140 feet long respectively at turntable at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1415. Correspondence File Number 368-2. Terminals Division. Other subject categories: Tracks Turntable Tracks.

      US WaBuPNRA D0261A-002-905 · Item · 1914-02-05
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 905. Providing one 2nd hand tent for use of electrician at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1028. Correspondence File Number 368. Terminals Division. Other subject categories: Structure Tent.

      US WaBuPNRA D0261A-002-953 · Item · 1914-04-01
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 953. Taking up old engine track in yard at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1082. Correspondence File Number 368-2. Terminals Division. Other subject categories: Tracks Engine.

      US WaBuPNRA D0261A-002-989 · Item · 1914-05-27
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 989. Construction of 175 feet of connecting track on 2nd Street in Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1124. Correspondence File Number X368-2. Terminals Division. Other subject categories: Tracks Connecting.

      US WaBuPNRA D0261A-002-1006 · Item · 1914-06-30
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1006. Constructing shed 42 feet by 154 feet over two tracks of Oregon Electric at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1141. Correspondence File Number 368-CS. Terminals Division. Other subject categories: Structure Train Shed.

      US WaBuPNRA D0261A-002-1016 · Item · 1914-07-23
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1016. Constructing four additional tracks on Wiedler Dock. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1125. Correspondence File Number 368-2. Terminals Division. Other subject categories: Tracks Construction.

      US WaBuPNRA D0261A-002-1056 · Item · 1914-10-07
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1056. Proportion of assessment for paving Edwards Street at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number RW 25. Correspondence File Number 368-X. Terminals Division. Other subject categories: Road Paving.

      US WaBuPNRA D0261A-002-1061 · Item · 1914-10-14
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1061. Moving 80 foot turntable to make room for proposed track at Portland, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1159. Correspondence File Number 368-2. Terminals Division. Other subject categories: Turntable.

      US WaBuPNRA D0261A-002-1014 · Item · 1914-07-23
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1014. Renewing railway crossing at Roosevelt Street, etc. at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1050. Correspondence File Number 368-4. Terminals Division. Other subject categories: Tracks Railroad Crossing.

      US WaBuPNRA D0261A-002-1019 · Item · 1914-08-05
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1019. Removing the cable between Railway Express Building and 3rd and Oak Streets at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1161. Correspondence File Number 368-0. Terminals Division. Other subject categories: Communication Cable.

      US WaBuPNRA D0261A-002-1054 · Item · 1914-09-29
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1054. Constructing shelves in Auditor's record room at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1185. Correspondence File Number 368-77. Terminals Division. Other subject categories: Furniture Shelving.