Railroads--Management

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

Hierarchical terms

Railroads--Management

Equivalent terms

Railroads--Management

  • UF Railroad project documents
  • UF Authorization documents

Associated terms

Railroads--Management

5 Archival description results for Railroads--Management

5 results directly related Exclude narrower terms

Great Northern Railway Authorization for Expenditure (AFE) 19622, S P & S Junction, Washington, 1922.

AFE 19622, S P & S Junction, Washington, 1922. Renew Frame Trestles #319.1 and 319.1-A and Place Concrete Pipe Culvert 700' E of Mp 1546 - Sp&S Junction to Wilson Creek. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $5175. Series II. Lines West. Spokane Division. Other Subject Categories: Structures, Bridges

Great Northern Railway Authorization for Expenditure (AFE) 35547, S P & S Junction, Washington, 1927.

AFE 35547, S P & S Junction, Washington, 1927. Replace Bridge 289 with 10'X10' Concrete Culvert; Replace Bridges 290 307 Ans 301A and 307.1 and 307.1A with Concrete Pipe Culverts; Replace One Row Vitirfied Pipe with Concrete Pipe at Culvert 2700' W Mp 1510; Place Riprap at Bridge 310 and 322; Ies, Etc at Bridges 320. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $17110. Series II. Lines West. Spokane Division.

Great Northern Railway Authorization for Expenditure (AFE) 37898, S. P. & S. Junction, Washington, 1928.

AFE 37898, S. P. & S. Junction, Washington, 1928. Replace Copper Clad Wire with Copper Wire From Idaho-Washington State Line to S.P.&S. Junction., Washington. Interstate Commerce Commission Account Number 27, Signals and Interlockers. Cost: $6280. Series II. Lines West. Spokane Division.

Great Northern Railway Authorization for Expenditure (AFE) 37902, S. P. & S. Junction, Washington, 1928.

AFE 37902, S. P. & S. Junction, Washington, 1928. Replacing Copper Clad Wire with Copper Wire From S.P.&S. Junction. to Wenatchee, Washington. Interstate Commerce Commission Account Number 27, Signals and Interlockers. Cost: $18420. Series II. Lines West. Spokane Division.

Great Northern Railway Authorization for Expenditure (AFE) 38343, S. P. & S. Junction, Washington, 1928.

AFE 38343, S. P. & S. Junction, Washington, 1928. Bridge and Culvert Work During Season 1929 Between S. P. and S. Junction. and Wilson Creek As Follows:
Bridge 327.1-
Renew Ties Ancd Buard Rail. Spot Paint Steel.
Bridge 329
Renew Ties and Buard Rail. Paint Steel.
Replace Timber Culvert at Road Crossing at Lyons with Timber Bridge and Wided Ditch.
Replace 3 Plank Boxes with Dalv. Iron Pipe.
Riprap 3 Culverts.
Place One Additional Crossing Culvert.
Extend One Vitrivied Pipe Culvert. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $2790. Series II. Lines West. Spokane Division.