Railroads--Management

Elements area

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

    Hierarchical terms

    Railroads--Management

    Equivalent terms

    Railroads--Management

    • UF Railroad project documents

    • UF Authorization documents

    Associated terms

    Railroads--Management

      233 Archival description results for Railroads--Management

      233 results directly related Exclude narrower terms
      US MnSpGNR E0045-003-002-339136 · Item · 1964
      Part of Great Northern Railway Authority for Expenditure Collection

      AFE 64.0327, Marysville, Washington, 1964. Install Electrric Interlocking at Bridge # 12; to Replace Mechanical Interlocking. Interstate Commerce Commission Account Number 27, Signals and Interlockers. Cost: $22000. Series II. Lines West. Other Subject Categories: Crossings, Interlocking Plants

      US MnSpGNR E0045-003-002-420239 · Item · 1902
      Part of Great Northern Railway Authority for Expenditure Collection

      AFE 5973, Marysville, Washington, 1902. Construct 250' for Jw Dalgleish Between Marysville and Silvana. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $255. Series I. Lines West. Cascade Division. Other Subject Categories: Track, Industry

      US MnSpGNR E0045-003-002-438962 · Item · 1928
      Part of Great Northern Railway Authority for Expenditure Collection

      AFE 38665, Marysville, Washington, 1928. Bridge No. 12 Over Ebeys Slough Near Marysville, Washington. Steel Bridge on Concrete Structure and Pile Testle Apporaches, 1100 Ft Long, 35 Ft High. Including 250 FeetSteel Swing Span.
      Replace South 346 FeetPile Trestle Approach with 3-48 Feetand 4-32 FeetSh. D.P.G Steel Spans and 1-32 Feetand 20 FeetNew Steel Beam Spans on Concrete, Filling, Balance of About 19 Feet.
      Replace North 500 FeetPile Trestle Approach with 1-64 Feetand 1-48 FeetSecondhand D.P.G Steel Spans on Concrete, Filling Balance of About 388 FeetConnect with Electric Power Line Using Transformer for Pier Light Circuit, and Abandon Submarine Light Cord, Install Draw Span Rotation Indicator. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $56000. Series II. Lines West. Cascade Division.