Railroads--Management

Elements area

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

    Hierarchical terms

    Railroads--Management

    Equivalent terms

    Railroads--Management

    • UF Railroad project documents

    • UF Authorization documents

    Associated terms

    Railroads--Management

      152867 Archival description results for Railroads--Management

      152865 results directly related Exclude narrower terms
      US WaBuPNRA D0261A-002-306 · Item · 1911-05-16
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 306. Installation of machines at Astoria, Oregon removed from Warrenton Shops. Chief Engineer/Standard Maintenance Procedure AFE Number SMP 15. Portland Division. Other subject categories: Tools Machinery.

      US WaBuPNRA D0261A-002-1716 · Item · 1916-12-27
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1716. Remove old contractor's office from point near depot at Astoria, load and ship to Flavel, placing same for tool house. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1772. Correspondence File Number A343. Portland Division. Other subject categories: Structure Tool House.

      US WaBuPNRA D0261A-002-1376 · Item · 1916-01-06
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1376. Renew 3900 lineal feet near east end of bridge number A-98-0 (Astoria Trestle) with 280 spans standard pile trestle. To carry out work found necessary on bridge inspection and provided for on 1916 work sheet. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1469. Correspondence File Number A34-7. Portland Division. Other subject categories: Bridge Renewal.

      US WaBuPNRA D0261A-002-1377 · Item · 1916-01-15
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1377. Place inside guard rail on 1200 lineal feet of bridge number A-98-0 (Astoria Trestle), located on 7 degree curve near Tongue Point. Part of bridge to be guard railed is on 7 degree curve and should have inside guard rail to insure safe operation of trains. Work provided for on 1916 work sheet. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1470. Correspondence File Number A34-7. Portland Division. Other subject categories: Bridge Guard Rail.

      US WaBuPNRA D0261A-002-806 · Item · 1913-09-11
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 806. Constructing additional gravel and stringer platforms at various locations on Astoria Division. Chief Engineer/Standard Maintenance Procedure AFE Number CE 872. Correspondence File Number A-17. Portland Division. Other subject categories: Structure Platform.

      US WaBuPNRA D0261A-002-176 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 176. Right of way fence on Astoria & Columbia River Railroad. Chief Engineer/Standard Maintenance Procedure AFE Number CE 177. Correspondence File Number A13. Portland Division. Other subject categories: Fence.

      US WaBuPNRA D0261A-002-267 · Item · 1911-02-02
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 267. Installation of electric crossing signal at Ash, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 324. Correspondence File Number 355-4. Vancouver Division. Other subject categories: Signals Crossing.

      US WaBuPNRA D0261A-002-195 · Item · 1910-07-15
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 195. Private road crossing at Ash, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 249. Correspondence File Number 355-4. Vancouver Division. Other subject categories: Crossing Road.

      US WaBuPNRA D0261A-002-1702 · Item · 1916-12-16
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1702. Line with concrete, Tunnel No. 16 located at mile post 272-0, 3.3 miles east of Farrington, Washington, also construct standard portals. Length of tunnel 2,483 feet. Work recommended by joint committee of NP, Great Northern& SP&S engineers. Chief Engineer/Standard Maintenance Procedure AFE Number CE 178(?). Correspondence File Number 66-16. Vancouver Division. Other subject categories: Tunnels.

      US WaBuPNRA D0261A-002-1701 · Item · 1916-12-16
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1701. Line with concrete, Tunnel No. 18, located at mile post 303.6, 1.7 miles west of Ankeny, Wash., also extend concrete 20 foot at east end and 30 foot at west end and build standard portals. Length of tunnel 339 lineal foot Length of proposed concrete lining 389 foot face to face of portals. Work recommended by joint committee of NP, Great Northernand SP&S engineers. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1782. Correspondence File Number 66-18. Vancouver Division. Other subject categories: Tunnels.