Plat Map of Great Northern facilities at Miller River, Washington, November 1, 1920, Sheet Number 1, Line Segment 37, showing the Sandpoint Junction-Everett Junction line.
Plat Map of Great Northern facilities at Miller River, Washington, November 1, 1920, Sheet Number 1, Line Segment 37, showing the Sandpoint Junction-Everett Junction line.
Plat Map of Great Northern facilities at Miller River, Washington, November 1, 1920, Sheet Number 2, Line Segment 37, showing the Sandpoint Junction-Everett Junction line.
AFE 22703, Miller River, Washington, 1923. Paint New Steel Span and Place Riprap at Pier #13 of Bridge #423. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $1180. Series II. Lines West. Cascade Division. Other Subject Categories: Structures, Bridges
AFE 20463, Miller River, Washington, 1922. Bridge Over Miller River. Remove 190' Steel Truss Span and Concrete Piers, Wrecked Dec 11 1921, Construct and Remove Temporary Shoo-Fly Trestle Built Around Wreckage. Emergency Work Following Wreck. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $23144. Series II. Lines West. Cascade Division. Other Subject Categories: Structures, Bridges
AFE 19284, Miller River, Washington, 1922. Construct 200 FeetSteel Truss Span and 1-54 FeetDeck Girder Span on Concrete Substructure, Replacing 190 FeetSteel Truss Span, Wrecked December 11th and Part of Fill Which Was Washed Out. Provide 12 Girder Spans in East Approach, 849 FeetTotal Length of Bridge, After Above Work Is Carried Out, 900 Feet. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $95000. Series II. Lines West. Cascade Division. Other Subject Categories: Structures, Bridges
AFE 14165, Miller River, Washington, 1920. Replace Inner Guard Rail with 80# Rail. Interstate Commerce Commission Account Number 9 Rails Cost: $640. Series II. Lines West. Cascade Division. Other Subject Categories: Track Maintenance, Rail
AFE 13791, Miller River, Washington, 1920. Remove Turnout 151 Feet Long Off Miller River Spur. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $40. Series II. Lines West. Cascade Division. Other Subject Categories: Track, Track Laying and Removal
Great Northern Engineering Drawing: Stress Sheet, Bridge 424 - Skykomish River, Miller River, Washington, Line Segment 037, Milepost 1735.3. Sheet 193 - 1832 - 4, 1898.
Great Northern Engineering Drawing: Steel Repairs, Bridge 424, west of Miller River, Washington, Line Segment 037, Milepost 1735.3. Sheet 193 - 1832 - 63, 1959.
Great Northern Engineering Drawing: Steel Design 252 Foot, Bridge 424, west of Miller River, Washington, Line Segment 037, Milepost 1735.3. Sheet 193 - 1832 - 39, 1907.