Plat Map of Great Northern facilities at Windham, Montana, January 1, 1964, Sheet Number 1, Line Segment 362, showing the Mossmain-Great Falls line.
Plat Map of Great Northern facilities at Windham, Montana, January 1, 1964, Sheet Number 2, Line Segment 362, showing the Mossmain-Great Falls line.
AFE 8308, Windham, Montana, 1918. Construct Two-Pen (Each 24' X 48') Stockyard, with Double-Deck Loading Chute, Hog Unloading Chute, and Water Supply. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $617. Series II. Lines West. Butte Division. Other Subject Categories: Stockyard Facilities
AFE 76.0208, Windham, Montana, 1975. Install with Booth. Interstate Commerce Commission Account Number 26, Communication Systems. Series BN. Lines West. Other Subject Categories: Communications, Telephone
AFE 68.0305, Windham, Montana, 1968. Renew. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Series II. Lines West. Other Subject Categories: Structures, Bridges
AFE 5950, Windham, Montana, 1917. Construct Wye Tracks (1740 Feet of Track). Interstate Commerce Commission Account Number 12 Track Laying and Surfacing Cost: $4243. Series II. Lines West. Butte Division. Other Subject Categories: Track, Track Laying and Removal
AFE 5537, Windham, Montana, 1917. Erect 30' X 36' Extension to Present 30' X 48' Depot, Put in Additional Waiting Room and Warm Room, and Construct 100' Extension to Cinder Platform. Interstate Commerce Commission Account Number 16 Station and Office Buildings Cost: $1535. Series II. Lines West. Butte Division. Other Subject Categories: Depots, Combination
AFE 4796, Windham, Montana, 1917. Construct Two Set-Out Tracks, 2600 FeetLong and 2390 FeetLong, Along Track to Lehigh. Interstate Commerce Commission Account Number 12 Track Laying and Surfacing Cost: $6845. Series II. Lines West. Butte Division. Other Subject Categories: Track, Track Laying and Removal
AFE 39097, Windham, Montana, 1928. Construct 96 X 96 FeetHolding Pen with Dates and Wing Fence and Replace 72" Woven Wire Fencing on Present Stockyard with Boards. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $385. Series II. Lines West. Butte Division.
AFE 38644, Wayne, Montana, 1928. Remove Poor Ballast and Clean Out Tunnels, Replacing Ballast with Washed Gravel: Also Place 3" Drain Each Side of Track Through Tunnel. Interstate Commerce Commission Account Number 3, Grading. Cost: $31300. Series II. Lines West. Butte Division.