Hillyard (Wash.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    • Taken From: "GN Locations" database compiled by Jim Chinquist, year 1950.

    Display note(s)

      Hierarchical terms

      Hillyard (Wash.)

      Hillyard (Wash.)

        Equivalent terms

        Hillyard (Wash.)

          Associated terms

          Hillyard (Wash.)

            1514 Archival description results for Hillyard (Wash.)

            1514 results directly related Exclude narrower terms
            US MnSpGNR E0045-003-002-431861 · Item · 1916
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 4376, Hillyard, Washington, 1916. Install An Extra 125 H.P. Boiler withStack and Fittings, and Put Up Small Lean-to at Boiler Shop. Interstate Commerce Commission Account Number 20 Shops and Engine Houses Cost: $1634. Series II. Lines West. Spokane Division. Other Subject Categories: Repair Facilities, Other

            US MnSpGNR E0045-003-002-443513 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 43539, Hillyard, Washington, 1930. Reimburse Washington Wood Preserving Company for. Cost of Changes Made at Treating Plant. Interstate Commerce Commission Account Number 20, Shops and Engine Houses. Cost: $7500. Series II. Lines West. Spokane Division. Other Subject Categories: Repair Facilities, Other

            US MnSpGNR E0045-003-002-443509 · Item · 1927
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 43308, Hillyard, Washington, 1930. Replace Frame Trestles 268 and 268A Each 48' Long with a 66' of 24" Concrete Pipe and Fill Bridges. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $110. Series II. Lines West. Spokane Division. Other Subject Categories: Structures, Bridges

            US MnSpGNR E0045-003-002-423830 · Item · 1929
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 40954, Hillyard, Washington, 1929. Replacing Tie Plates with 12,800 Tie Plates in The Main Lines Thru The Yards. Interstate Commerce Commission Account Number 10 Other Track Material Cost: $3070. Series II. Lines West. Spokane Division. Other Subject Categories: Track Maintenance, OTM

            US MnSpGNR E0045-003-002-423812 · Item · 1929
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 40954, Hillyard, Washington, 1929. Hillyard Washington. - Relaying with Secondhand 90# Rail, 1,110 Ft of Approach Tracks to Transfer The Table at The Machine Shop Replacing The Present 68# Rail Ties and Tie Plates at Hillyard. Interstate Commerce Commission Account Number 9 Rails Cost: $2600. Series II. Lines West. Other Subject Categories: Track Maintenance, Rail

            US MnSpGNR E0045-003-002-423810 · Item · 1929
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 40890, Hillyard, Washington, 1929. Hillyard - Relay with Secondhand 90# Rail and New 90# Switch Material 7 Turnouts at The West End of The West Yard Replacing 85# Material. Interstate Commerce Commission Account Number 9 Rails Cost: $4290. Series II. Lines West. Spokane Division. Other Subject Categories: Track, Yards,

            US MnSpGNR E0045-003-002-423811 · Item · 1929
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 40444, Hillyard, Washington, 1929. Relay with Secondhand 90# Rail, 1,110 Ft of Approach Tracks to Transfer The Table at The Machine Shop Replacing The Present 68# Rail Ties and Tie Plates at Hillyard. Interstate Commerce Commission Account Number 9 Rails Cost: $2600. Series II. Lines West. Spokane Division. Other Subject Categories: Track, Yards,

            US MnSpGNR E0045-003-002-443499 · Item · 1927
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 39862, Hillyard, Washington, 1929. Install Coal Handling Equipment at Tie Treating Plant. Interstate Commerce Commission Account Number 20, Shops and Engine Houses. Cost: $8721. Series II. Lines West. Spokane Division. Other Subject Categories: Repair Facilities, Other

            US MnSpGNR E0045-003-002-438057 · Item · 1929
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 39559, Hillyard, Washington, 1929. Remove Buda Electric Truck Great Northern 4357 at Stores, Hillyard, Wa. Interstate Commerce Commission Account Number 58, Miscellaneous Equipment. Cost: $2486. Series II. Lines West. Spokane Division. Other Subject Categories: Shop Equipment

            US MnSpGNR E0045-003-002-438328 · Item · 1929
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 39293, Hillyard, Washington, 1929. Hillyard - Construct Safety Walk in Coal Chute and Repair Pits and Old Portion of Roundhouse. Spokane - Construct Partition and Door in Old Ice House and Replace Walk Inside Fence at West End of Platform with Concrete. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $1100. Series II. Lines West. Spokane Division.

            US MnSpGNR E0045-003-002-438422 · Item · 1929
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 39234, Hillyard, Washington, 1929. Construct 50 X 400 Frame Lumber Shed. Enclose One Section of Former Scrap Bins, Place Shelving and Lighting. Install Steam Heat in Car Shop Sub-Store. Construct 1600 Sq Yards of Concrete Runway. Remove Push Car Track North of Car Shop. Rearrange Trackage to Serve New Lumber Shed, for Stores Department. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $29770. Series II. Lines West. Spokane Division.

            US MnSpGNR E0045-003-002-438648 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 39010, Hillyard, Washington, 1928. Install and Ingersoll Rand Electric Driven Air Compressor and Charge Out Value of Black and Decker Bench Grinder Great Northern 6700 at Hillyard, Washington. Interstate Commerce Commission Account Number 20, Shops and Engine Houses. Cost: $8355. Series II. Lines West. Spokane Division.

            US MnSpGNR E0045-003-002-443497 · Item · 1927
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38961, Hillyard, Washington, 1928. Replace Grind Stone Great Northern 1405 with Grind Stone Great Northern 5429. Interstate Commerce Commission Account Number 44, Shop Machinery. Cost: $61. Series II. Lines West. Spokane Division. Other Subject Categories: Shop Equipment

            US MnSpGNR E0045-003-002-438880 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38714, Hillyard, Washington, 1928. Purchase and Install One Portableelectric Welding Machine and One 9 FeetRadial Dirll (Motor Driven) at Hillyard Shops. Interstate Commerce Commission Account Number 20, Shops and Engine Houses. Cost: $15482. Series II. Lines West. Spokane Division.

            US MnSpGNR E0045-003-002-438875 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38711, Hillyard, Washington, 1928. Installing 65 FeetTransfer Table of 300 Ton Capacity (4-Panel Table with 5 Longitudinal Rails on Creosoted Ties in Pit) to Replace Present 55 Feet185-Ton Transfer Table at Hillyard, Washington. Interstate Commerce Commission Account Number 20, Shops and Engine Houses. Cost: $33925. Series II. Lines West. Spokane Division.

            US MnSpGNR E0045-003-002-439118 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38559, Hillyard, Washington, 1928. Construct Additionalfacilities for Cleaning Cars Consisting of Six Trash Incinerators, 1500 Feetof Water Pepe with Necessary Hydrants, 960 Feetof Air Pipe and 3430 Ft of Track.
            Construct Switching Track at Francis Avenue., for Handling of Western Fruit Express, General American Tano Car Corp. and Tie Plant Cars; Also Rearrange West End of Burke Yard to Connect with Repair Tracks Near Lumber Yard. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $32780. Series II. Lines West. Spokane Division.

            US MnSpGNR E0045-003-002-439460 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38298, Hillyard, Washington, 1928. Renew Blowoff, Wash Out and Refill Pipe Lines in Old Portion of Hillyard Roundhouse: Also Chenge Feed System, Remodel Burners and Do Other Work at Central Heating System User Spolane Passenger Station, Required in Converting System to Gravity Feed. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $2930. Series II. Lines West. Spokane Division.