AFE 8158, Embro, Washington, 1903. (Alvin Siding) - Make Line Change. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Series I. Lines West. Other Subject Categories: Track, Track Laying and Removal
AFE 8158, Embro, Washington, 1903. (Alvin Siding) - Make Line Change. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Series I. Lines West. Other Subject Categories: Track, Track Laying and Removal
AFE 7408, Embro, Washington, 1918. Remove Old Main Line and Portion of Passing Track, Also Bridge No. 398, Opposite Change of Line Made Under A.F.E. Pres. No. 2199. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $-2850. Series II. Lines West. Cascade Division. Other Subject Categories: Track, Mainline
AFE 7372, Embro, Washington, 1902. (Alvin Siding) - Construct Bridge. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Series I. Lines West. Other Subject Categories: Structures, Bridges
AFE 5175, Embro, Washington, 1901. (Alvin Siding) - Rip Rap at Martin Creek. Interstate Commerce Commission Account Number 3 Grading. Series I. Lines West. Other Subject Categories: Track Maintenance, Rip Rap
AFE 4905, Embro, Washington, 1917. Interstate Commerce Commission Account Number 13, Fences, Snowsheds and Signs. Series I. Lines West. Other Subject Categories: Structures, Snow Sheds
AFE 4281, Embro, Washington, 1901. (Alvin) - Relocate Water Tank to Everett. Interstate Commerce Commission Account Number 18, Water Stations. Cost: $0. Series I. Lines West. Other Subject Categories: Servicing Facilities, Water
AFE 4213, Embro, Washington, 1901. (Alvin Siding) - Remove Temporary Water Tank - Install at Everett. Interstate Commerce Commission Account Number 18, Water Stations. Cost: $14. Series I. Lines West. Other Subject Categories: Servicing Facilities, Water
AFE 25530, Embro, Washington, 1915. Construct 697.8 Foot Long Extension to Spur Track. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $827. Series I. Lines West. Cascade Division. Other Subject Categories: Track, Industry
AFE 23275, Embro, Washington, 1923. Renew with Timber, 226' Single Track Timber Snow Shed on East Slope and 819' Single Track Snow Sheds on West Slope. Also Renew Roof Timber on 330' of Combination Shed No. 1711.6 Between Embro and Leavenworth. Interstate Commerce Commission Account Number 13, Fences, Snowsheds and Signs. Cost: $160500. Series II. Lines West. Cascade Division. Other Subject Categories: Structures, Snow Sheds
AFE 2199, Embro, Washington, 1916. Construct Change of Line to Eliminate Bridge No. 398, From Station No. 208+62.8 to Station No. 225+07.6, Including 687 Lineal Feet of Double Track Combination Snow Shed, 600 Lineal Feet Single Tack Timber Lined Tunnel, Shortening East End of Passing Track 725 Feet, Remodeling Timber Shed 1715.4 Into Double Track to Allow Extension to West End of Passing Track of 780 Feet. Interstate Commerce Commission Account Number 12 Track Laying and Surfacing Cost: $199244. Series II. Lines West. Cascade Division. Other Subject Categories: Track, Mainline