Ellsworth (Wash.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    • Taken From list of SP&S Stations and Spurs.

    Display note(s)

      Hierarchical terms

      Ellsworth (Wash.)

      Ellsworth (Wash.)

        Equivalent terms

        Ellsworth (Wash.)

          Associated terms

          Ellsworth (Wash.)

            5 Archival description results for Ellsworth (Wash.)

            5 results directly related Exclude narrower terms
            US WaBuPNRA D0261A-002-1266 · Item · undated
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1266. Extend spur track 40 feet at Ellsworth, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1370. Correspondence File Number 382-1. Vancouver Division. Other subject categories: Tracks Spur.

            US WaBuPNRA D0261A-002-1536 · Item · undated
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1536. Install a private crossing and two standard 14 foot gates 1656 feet west of mile post 17 near Ellsworth, Washington, to furnish crossing as provided in right of way deed for Lot 78 of Columbia Homestead Lots. Correspondence File Number 382-4. Vancouver Division. Other subject categories: Crossing Road.

            US WaBuPNRA D0261A-002-1414 · Item · 1916-02-24
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1414. Construct permanent bridge number 17-3 across Love's Lake, located 0.8 miles east of Ellsworth, Washington. Bridge to be a concrete trestle 320 lineal feet long consisting of twenty 16 foot concrete slab spans on concrete piers; 16 lineal feet to be filled. Present pile trestle 336 feet in length and requires renewal. Work provided for by 1916 budget. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1521. Correspondence File Number 34-17L. Vancouver Division. Other subject categories: Bridge Construction.

            US WaBuPNRA D0261A-002-1695 · Item · 1916-12-12
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1695. Remove present spur and construct side track 1000 foot long connected at both ends, also a driveway to be built along outside of side track. Track to be located with the west headblock just east of county road crossing at Ellsworth, Wash. The east 350 foot of track to be divided on basis of standard side track agreement with Columbia River Packers Association and the SP&S to bear all other expense. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1761. Correspondence File Number 382-1. Vancouver Division. Other subject categories: Track Side.

            US WaBuPNRA D0261A-002-121 · Item · 1910-04-05
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 121. Third class station building at Ellsworth, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 118. Vancouver Division. Other subject categories: Structure Depot.