Elements area
Taxonomy
Code
Scope note(s)
Source note(s)
Taken From: "GN Locations" database compiled by Jim Chinquist, year 1950.
Taken From: "GN Locations" database compiled by Jim Chinquist, year 1950.
AFE 920, Crater, Washington, 1915. Move 8' X 10' Watchman's Shack From Crate Tunnel to West End of Bridge No. 359, Over The Columbia River, 2 1/4 Miles East of Malaga, and Construct A 8' X 10' Extension to Same. Interstate Commerce Commission Account Number 17 Roadway buildings Cost: $51. Series II. Lines West. Spokane Division. Other Subject Categories: Roadway Buildings, Signal Bungalow
AFE 85316, Crater, Washington, 1955. Relay 6.2 Miles of Main Line. Furnish Ew Track Spikes and Reuse Secondhand Track Spikes. Place 32 Rail Anchors Per Panel of Track From Crater to Columbia River, Wash. Interstate Commerce Commission Account Number 9 Rails Cost: $261500. Series II. Lines West. Spokane Division. Other Subject Categories: Track Maintenance, Rail
AFE 84816, Crater, Washington, 1953. Relay 1.81 Miles of Main Line; Provide New Spikes for Track and Reuse Old to Tie Down Tie Plates. Interstate Commerce Commission Account Number 9 Rails Cost: $58550. Series II. Lines West. Spokane Division. Other Subject Categories: Track Maintenance, Rail
AFE 8157, Crater, Washington, 1903. Bank Widen. Interstate Commerce Commission Account Number 3 Grading. Series I. Lines West. Other Subject Categories: Track Maintenance, Grading and Embankment
AFE 8036, Crater, Washington, 1918. Construct 808 FeetExtension East End and 892 FeetExtension West End of Passing Track. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $10000. Series II. Lines West. Spokane Division. Other Subject Categories: Track, Passing
AFE 7489, Crater, Washington, 1918. Remove 4' X 6' Privy Originally Constructed for U.S. Guards. Interstate Commerce Commission Account Number 21, Grain Elevators. Cost: $-7. Series II. Lines West. Spokane Division. Other Subject Categories: Industries, Elevators