Chemult (Or.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    • Taken From: "GN Locations" database compiled by Jim Chinquist, year 1950.

    Display note(s)

      Hierarchical terms

      Chemult (Or.)

      Chemult (Or.)

        Equivalent terms

        Chemult (Or.)

          Associated terms

          Chemult (Or.)

            48 Archival description results for Chemult (Or.)

            US MnSpGNR E0045-003-002-433596 · Item · 1953
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 83715, Chemult, Oregon, 1953. Replace Gas Operated Pumping Equipment at Section House with Electric Operated Motor Jet Pump and Pressure System. Interstate Commerce Commission Account Number 17, Roadway buildings. Cost: $589. Series A. Lines West. Other Subject Categories: Roadway Buildings, Section Facilities

            US MnSpGNR E0045-003-002-433393 · Item · 1952
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 83512, Chemult, Oregon, 1952. Construct New Interchange Track 1864 Feet Long, 851 Feet New Connecting Track 1200 Feet Long and Remove Present Connecting Track 992 Feet Long for Interchange with Southern Pacific. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $14954. Series A. Lines West. Other Subject Categories: Track, Other

            US MnSpGNR E0045-003-002-433085 · Item · 1951
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 80638, Chemult, Oregon, 1951. Replace 8X10-1/2'' Tie Plates with New Double Shoulder 8-1/2X12'' Or 13'' Tie Plates, Reuse Spikes. Interstate Commerce Commission Account Number 10, Other Track Material. Cost: $7336. Series A. Lines West. Other Subject Categories: Track Maintenance, OTM

            US MnSpGNR E0045-003-002-434267 · Item · 1968
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 68.375, Chemult, Oregon, 1968. Extend Siding Eastward 2,475 Feet to Increase Siding Capacity From 108 Car Lengths to 152 Car Lengths. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $20926. Series A. Lines West. Other Subject Categories: Track, Track Laying and Removal