Butler (Wash.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    • Taken From list of SP&S Stations and Spurs.

    Display note(s)

      Hierarchical terms

      Butler (Wash.)

      Butler (Wash.)

        Equivalent terms

        Butler (Wash.)

          Associated terms

          Butler (Wash.)

            11 Archival description results for Butler (Wash.)

            11 results directly related Exclude narrower terms
            US WaBuPNRA D0261A-002-1242 · Item · 1915-07-23
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1242. Build 4 car spur 360 feet long for Dopp & Hansman Company 3/4 mile east of Butler, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1341. Correspondence File Number 358-1. Vancouver Division. Other subject categories: Tracks Spur.

            US WaBuPNRA D0261A-002-1137 · Item · 1915-02-23
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1137. Backfilling 10 foot arch culvert Number 44-31, 1 1/2 miles east of Butler, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1233. Correspondence File Number 50-1. Vancouver Division. Other subject categories: Culvert.

            US WaBuPNRA D0261A-002-918 · Item · 1914-02-13
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 918. Building side walk on bridge 42.7 at Butler, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1041. Correspondence File Number 34-1. Vancouver Division. Other subject categories: Sidewalk.

            US WaBuPNRA D0261A-002-1031 · Item · 1914-08-24
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1031. Constructing 160 rods of right of way fence, Milepost 44.3 east at Butler, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1164. Correspondence File Number 13-1. Vancouver Division. Other subject categories: Fencing.

            US WaBuPNRA D0261A-002-627 · Item · 1913-02-15
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 627. 1200 foot industrial track at Butler, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 682. Correspondence File Number 358-1. Vancouver Division. Other subject categories: Tracks Industrial.

            US WaBuPNRA D0261A-002-371 · Item · 1911-08-12
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 371. 1000 ft right of way east of Woodard Creek at Butler, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 425. Correspondence File Number 13-1. Vancouver Division. Other subject categories: Trackage Right of Way.

            US WaBuPNRA D0261A-002-62 · Item · undated
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 62. Channel change at Woodard Creek and track work at Butler, Washington. Vancouver Division. Other subject categories: Bridge Creek Change.