Boylston (Wis.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    • Taken From: "GN Locations" database compiled by Jim Chinquist, year 1950.

    Display note(s)

      Hierarchical terms

      Boylston (Wis.)

      Boylston (Wis.)

        Equivalent terms

        Boylston (Wis.)

          Associated terms

          Boylston (Wis.)

            105 Archival description results for Boylston (Wis.)

            105 results directly related Exclude narrower terms
            US MnSpGNR E0045-003-002-439271 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38419, Boylston, Wisconsin, 1928. Replace Pile Bridge #2-15 Ft Long and 3 Feet High-with 2 Lines 24" Concrete Pipe 24 Ft Long and Fill. Also Replace Double Timber Box Culvert 1510 Ft W. Milepost 25-5 X 186' with Two Lines 36" Concrete Pipe 184 Ft Long - Suring Season 1929. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $2108. Series II. Lines East. Mesabi Division.

            US MnSpGNR E0045-003-002-439151 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38527, Boylston, Wisconsin, 1928. Furnish and Place 12800 Cubic Yds Bankwidening and 66 Cubic Yds Gravel Ballast on Both Main Tracks 440+00 to Station 527+00 at Boyleston, Wisconsin. Interstate Commerce Commission Account Number 3, Grading. Cost: $11700. Series II. Lines East. Mesabi Division. Other Subject Categories: Track Maintenance, Grading and Embankment

            US MnSpGNR E0045-003-002-438936 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38646, Boylston, Wisconsin, 1928. Bridge No. 16 Over Nemadji River, Near Boulston, Wisconsin. Steel Viaduct 1988 Feet Long, 95 FeetHigh and Pile Trestle East Approach 219 Ft Long, Total Length 2207 Feet- 138 FeetDeck Truss Reinforced in 1927

            Replace Timber Approach with Steel Viaduct on Concrete Substructure 210 Feet Long. Renew Ties on Present Steel, Except 138 FeetTruss Span, Fill Balance Line and Surface Steel. Replace 90 Lb Rail with 110 Lb Rail on Bridge. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $65000. Series II. Lines East. Mesabi Division.