Blind Slough (Or.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    • Taken From list of SP&S Stations and Spurs.

    Display note(s)

      Hierarchical terms

      Blind Slough (Or.)

      Blind Slough (Or.)

        Equivalent terms

        Blind Slough (Or.)

          Associated terms

          Blind Slough (Or.)

            6 Archival description results for Blind Slough (Or.)

            6 results directly related Exclude narrower terms
            US WaBuPNRA D0261A-002-102 · Item · 1910-02-25
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 102. Third class depot at Blind Slough, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 164. Correspondence File Number A346. Portland Division. Other subject categories: Structure Depot.

            US WaBuPNRA D0261A-002-221 · Item · 1910-10-10
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 221. Seven 3 pile dolphins for Blind Slough Draw Bridge. Chief Engineer/Standard Maintenance Procedure AFE Number CE 272. Correspondence File Number A33-2. Portland Division. Other subject categories: Bridge Dolphins.

            US WaBuPNRA D0261A-002-1849 · Item · undated
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1849. Renew bridge A-84-8 with standard pile trestle. Correspondence File Number A34-7. Portland Division. Other subject categories: Bridge Trestle.

            US WaBuPNRA D0261A-002-1502 · Item · undated
            Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

            Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1502. Construct a raised platform 10 foot by 16 foot with a 4 foot incline down to present platform at Blind Slough, Oregon, to provide facilities for handling heavy shipments of oil and cable. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1592. Correspondence File Number A346. Portland Division. Other subject categories: Structure Platform.