AFE 38478, Barnesville, Minnesota, 1928. Necessary Repairs and Renewals to Bridges and Culverts During Season 1929 Between Barnesvville and Noyes, As Follows:
Bridge 45 - Pile - 42 Feet Long, 6 FeetHigh
Replace with 2 Lines 48" Conc. Pipe 32 Feet Long and Fill
Bridge 78 - Pile - 55 Feet Long 4 1/2 FeetHigh
Replace with Creosoted Timber Trestle 52 Feet Long
Bridge 126 - Pi;Le - 28 Feet Long 7 FeetHigh.
Replace with Cresosted Timber Trestle 26 Feet Long
Bridge 219.2 - Pile - 15 Feet Long, 7 Ft High.
Replace with 2 Lines 36" Conc. Pipe 32 Feet Long and Fill.
Bridge 186 - Pile - 42. Long 8 FeetHigh
Renew Caps Bents 1 and 3 and All Stringers.
Bridge 186.1 - Pile - 42 Feet Long, 10 FeetHigh.
Renew Stringers
Bridge 264 - Pile - 42 Feet Long, 10 FeetHigh.
Renew All Stringers, Renew Cap Bents 5 and 11, Shorten by One Span.
Replace Three Timber Crossing Culverts with Concrete Pipes. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $5965. Series II. Lines East. Dakota Division.