Armington (Mont.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    Display note(s)

      Hierarchical terms

      Armington (Mont.)

      Armington (Mont.)

        Equivalent terms

        Armington (Mont.)

          Associated terms

          Armington (Mont.)

            100 Archival description results for Armington (Mont.)

            US MnSpGNR E0045-003-002-431208 · Item · 1915
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 827, Armington, Montana, 1915. Construct Spur Track 250 FeetLong for W.R. Goodman, From Sta. 1236 to 1238+50 on The Neihart Branch, and Remove 220 Feetof Seigling Spur. Interstate Commerce Commission Account Number 12 Track Laying and Surfacing Cost: $376. Series II. Lines West. Butte Division. Other Subject Categories: Track, Industry

            US MnSpGNR E0045-003-002-433081 · Item · 1951
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 80591, Armington, Montana, 1951. Replace 118 Feet Nine Span Pile Trestle with Three Steel Beam Spans on Concrete Substructure Over Otter Creek. Place Trainman's Walk on South Side and Raise Grade 5-1/2 Inches. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Series A. Lines West. Other Subject Categories: Structures, Bridges

            US MnSpGNR E0045-003-002-432900 · Item · 1918
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 7130, Armington, Montana, 1918. Remove Coal Hoist, for Use in Connection with Work Being Carried Out at Vancouver, B.C. Interstate Commerce Commission Account Number 19, Fueling Stations. Cost: $-218. Series II. Lines West. Butte Division. Other Subject Categories: Servicing Facilities, Coal

            US MnSpGNR E0045-003-002-432064 · Item · 1917
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 4973, Armington, Montana, 1917. Erect New 30' X 48' Frame Depot withSingle Waiting Room, Standard Plank Platform and Standard Two-Arm Train Order Signal; Recover Present Portable Depot and Throw Tracks to Provide Clearance for Train Order Signal. Interstate Commerce Commission Account Number 16 Station and Office Buildings Cost: $1751. Series II. Lines West. Butte Division. Other Subject Categories: Station Facilities,

            US MnSpGNR E0045-003-002-431922 · Item · 1917
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 4602, Armington, Montana, 1917. Construct A Stockyard Consisting of Two Pens, Each 48' X 48', with 16 ' X 48' Shelter Shed, Hog Unloading Chute, Double-Deck Loading Chute and Holding Pen of Woven Wire 72' X 104', and Provide Water Supply; Also Remove Old Stockyard and Stockyard Track. Interstate Commerce Commission Account Number 16 Station and Office Buildings Cost: $583. Series II. Lines West. Butte Division. Other Subject Categories: Stockyard Facilities,

            US MnSpGNR E0045-003-002-438103 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 39532, Armington, Montana, 1928. Construct 350' Spru Track and Loading Trestle to Serve Anaconda Copper Mining Company. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $2340. Series II. Lines West. Butte Division. Other Subject Categories: Track

            US MnSpGNR E0045-003-002-438583 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 39100, Armington, Montana, 1928. Construct 2 Additional Pens 48 X 96 FeetIn Rear of Present Yard and One Double Deck Unlaoding Chute. Build Fences Between Present Chutes. Move Hog Unloading Chute and Rearrange Wing Fence, Fence in Well at Armington, Montana. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $770. Series II. Lines West. Butte Division.

            US MnSpGNR E0045-003-002-438944 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38655, Geyser, Montana, 1928. Bridge # 414, Pile and Frame Trestel (14 Miles North) - Replace with Steel Spans on Concrete Substructure, and Raise Grade 6 In.

            Bridge # 505, Pile Trestle (1.6 Miles South)- Replace with Steel Spans on Creos. Pile Piers, and Concrete Pile Trestle Spans, and Raise .6 Feet. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $34500. Series II. Lines West. Butte Division.

            US MnSpGNR E0045-003-002-439236 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38508, Armington, Montana, 1928. Make Repairs to Bridge No. 192, 228 and 233.

            Replace One Timber Culvert with Galvanized Pipe.
            Riprap Piers Bridges No. 193 and 215.
            Remove Gravel Deck on Bridge 220.
            Renew Briidges 227 and 231 with Pile Trestles.
            Put on Secondhand Tie Plates, Remove Gravel Deck and Repair Bridge 229.
            Renew Ties, Stringers, Guard Rail and Bulkheads Bridge No. 238. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $6500. Series II. Lines West. Butte Division.

            US MnSpGNR E0045-003-002-439219 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 38501, Armington, Montana, 1928. Replace Tie Plates with 7 1/2X10 1/2" Tie Plates at Bridge No. 520
            Replace Timber Culvert at Road Crossing West of Wayne Depot with Dalvanized Pipe. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $85. Series II. Lines West. Butte Division.

            US MnSpGNR E0045-003-002-441809 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 36279, Armington, Montana, 1928. Replac 3194 90# Wolhaupter Joints with 6388 New 90# Angle Bars and 6388 Secondhand 7-5-58 Tie Plates Between Armington and Moccasin, Montana. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $10760. Series II. Lines West. Butte Division.

            US MnSpGNR E0045-003-002-441723 · Item · 1928
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 36261, Armington, Montana, 1928. Make Repairs to Roadbed, Ballast Section and Bridges on Account of Damage by High Water in June 1927, Between Armington and Niehart, Montana. Interstate Commerce Commission Account Number 3, Grading. Cost: $18400. Series II. Lines West. Butte Division.

            US MnSpGNR E0045-003-002-441633 · Item · 1927
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 36236, Armington, Montana, 1927. Highway Bridge Over Belt Creek at Armington, Montana.
            Timber Bridge 104 Feet Long 14 Feet High, 18 Feet Roadway and 7 Feet Sidewalk.
            Replace with One 80-Ft. Secondhand Steel and Itron Thru Truss Span on Creosoted Pile Piers and Timber Approaches 110 Feet Long, 19 FeetRoadway and 7 FeetSidewalk. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $11000. Series II. Lines West. Butte Division.