Armington (Mont.)

Taxonomy

Code

Scope note(s)

Source note(s)

Display note(s)

Hierarchical terms

Armington (Mont.)

BT Montana

Armington (Mont.)

Equivalent terms

Armington (Mont.)

Associated terms

Armington (Mont.)

43 Archival description results for Armington (Mont.)

43 results directly related Exclude narrower terms

Great Northern Railway Authorization for Expenditure (AFE) 4973, Armington, Montana, 1917.

AFE 4973, Armington, Montana, 1917. Erect New 30' X 48' Frame Depot withSingle Waiting Room, Standard Plank Platform and Standard Two-Arm Train Order Signal; Recover Present Portable Depot and Throw Tracks to Provide Clearance for Train Order Signal. Interstate Commerce Commission Account Number 16 Station and Office Buildings Cost: $1751. Series II. Lines West. Butte Division. Other Subject Categories: Station Facilities,

Great Northern Railway Authorization for Expenditure (AFE) 4602, Armington, Montana, 1917.

AFE 4602, Armington, Montana, 1917. Construct A Stockyard Consisting of Two Pens, Each 48' X 48', with 16 ' X 48' Shelter Shed, Hog Unloading Chute, Double-Deck Loading Chute and Holding Pen of Woven Wire 72' X 104', and Provide Water Supply; Also Remove Old Stockyard and Stockyard Track. Interstate Commerce Commission Account Number 16 Station and Office Buildings Cost: $583. Series II. Lines West. Butte Division. Other Subject Categories: Stockyard Facilities,

Great Northern Railway Authorization for Expenditure (AFE) 39532, Armington, Montana, 1928.

AFE 39532, Armington, Montana, 1928. Construct 350' Spru Track and Loading Trestle to Serve Anaconda Copper Mining Company. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $2340. Series II. Lines West. Butte Division. Other Subject Categories: Track

Great Northern Railway Authorization for Expenditure (AFE) 39100, Armington, Montana, 1928.

AFE 39100, Armington, Montana, 1928. Construct 2 Additional Pens 48 X 96 FeetIn Rear of Present Yard and One Double Deck Unlaoding Chute. Build Fences Between Present Chutes. Move Hog Unloading Chute and Rearrange Wing Fence, Fence in Well at Armington, Montana. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $770. Series II. Lines West. Butte Division.

Great Northern Railway Authorization for Expenditure (AFE) 38655, Geyser, Montana, 1928.

AFE 38655, Geyser, Montana, 1928. Bridge # 414, Pile and Frame Trestel (14 Miles North) - Replace with Steel Spans on Concrete Substructure, and Raise Grade 6 In.

Bridge # 505, Pile Trestle (1.6 Miles South)- Replace with Steel Spans on Creos. Pile Piers, and Concrete Pile Trestle Spans, and Raise .6 Feet. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $34500. Series II. Lines West. Butte Division.

Great Northern Railway Authorization for Expenditure (AFE) 38508, Armington, Montana, 1928.

AFE 38508, Armington, Montana, 1928. Make Repairs to Bridge No. 192, 228 and 233.

Replace One Timber Culvert with Galvanized Pipe.
Riprap Piers Bridges No. 193 and 215.
Remove Gravel Deck on Bridge 220.
Renew Briidges 227 and 231 with Pile Trestles.
Put on Secondhand Tie Plates, Remove Gravel Deck and Repair Bridge 229.
Renew Ties, Stringers, Guard Rail and Bulkheads Bridge No. 238. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $6500. Series II. Lines West. Butte Division.

Great Northern Railway Authorization for Expenditure (AFE) 38501, Armington, Montana, 1928.

AFE 38501, Armington, Montana, 1928. Replace Tie Plates with 7 1/2X10 1/2" Tie Plates at Bridge No. 520
Replace Timber Culvert at Road Crossing West of Wayne Depot with Dalvanized Pipe. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $85. Series II. Lines West. Butte Division.

Results 11 to 20 of 43