Allouez (Wis.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    • Taken From: "GN Locations" database compiled by Jim Chinquist, year 1950.

    Display note(s)

      Hierarchical terms

      Allouez (Wis.)

      Allouez (Wis.)

        Equivalent terms

        Allouez (Wis.)

          Associated terms

          Allouez (Wis.)

            1493 Archival description results for Allouez (Wis.)

            1493 results directly related Exclude narrower terms
            US MnSpGNR E0045-003-002-398183 · Item · 1922
            Part of Great Northern Railway Authority for Expenditure Collection

            Great Northern Railway Authorization for Expenditure (AFE) 21587, Allouez, Wisconsin, 1922. Construct 6" Water Connection 61' Long From The City Water Main to The Great Northern 8" Water Main, Also Construct A 4" Drain 95' Long From The Meter Box on The New Water Connection to The City Sewer. Interstate Commerce Commission Account Number 18 Water Stations Cost: $820. Series II. Lines East. Mesabi Division. Other Subject Categories: Servicing Facilities, Water

            US MnSpGNR E0045-003-002-314794 · Item · 1953
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 2125, Allouez, Wisconsin, 1953. Install Drinking Water Facilites in Ore Dock Interlocking. Interstate Commerce Commission Account Number 27, Signals and Interlockers. Cost: $325. Series CER. Lines East. Mesabi Division. Other Subject Categories: Crossings, Interlocking Plants

            US MnSpGNR E0045-003-002-359827 · Item · 1912
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 21132, Allouez, Wisconsin, 1912. Erect 11 Stall, with Power House, Cinder Pit, Store House, and Scrap Bin, Remove Old Store and Oil House. Interstate Commerce Commission Account Number 20, Shops and Engine Houses. Cost: $134879. Series I. Lines East. Mesabi Division. Other Subject Categories: Repair Facilities, Other

            US MnSpGNR E0045-003-002-314228 · Item · 1922
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 20636, Allouez, Wisconsin, 1922. Construct Pile and Timber Bulkhead Opposite Outer End of Dock. Ore Dock #1. Interstate Commerce Commission Account Number 24, Coal and ore wharves. Cost: $11500. Series II. Lines East. Mesabi Division. Other Subject Categories: Docks, Ore

            US MnSpGNR E0045-003-002-308609 · Item · 1912
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 20576, Allouez, Wisconsin, 1912. Place Electric Back Locks on Signal Levers on Ore Dock Trestle. Interstate Commerce Commission Account Number 27, Signals and Interlockers. Cost: $1166. Series I. Lines East. Mesabi Division. Other Subject Categories: Crossings, Interlocking Plants

            US MnSpGNR E0045-003-002-314227 · Item · 1922
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 20428, Allouez, Wisconsin, 1922. Relay 533' Track with Secondhand 90 # Rail on Cut Off Track Between Empty Yard and New Hump Yard. Interstate Commerce Commission Account Number 9, Rails. Cost: $780. Series II. Lines East. Mesabi Division. Other Subject Categories: Track, Yards

            US MnSpGNR E0045-003-002-302955 · Item · 1921
            Part of Great Northern Railway Authority for Expenditure Collection

            AFE 19730, Allouez, Wisconsin, 1921. Replce Present 350 Pocket Timber Dock with New Concrete and Steel Dock 80' High, Equip with Electric Spout Hoists, Raise Present Approach to 80'. Interstate Commerce Commission Account Number 24, Coal and ore wharves. Cost: $2605000. Series II. Lines East. Mesabi Division. Other Subject Categories: Docks, Ore

            US MnSpGNR E0045-003-002-397859 · Item · 1922
            Part of Great Northern Railway Authority for Expenditure Collection

            Great Northern Railway Authorization for Expenditure (AFE) 19338, Allouez, Wisconsin, 1922. Charge for Construction of Three Tracks One 539.5' , One 994' , One 1199' Completed in 1920. Interstate Commerce Commission Account Number 12 Track Laying and Surfacing Cost: $3015. Series II. Lines East. Mesabi Division. Other Subject Categories: Track, Industry