Washougal (Wash.)

Taxonomy

Code

Scope note(s)

Source note(s)

Display note(s)

Hierarchical terms

Washougal (Wash.)

Washougal (Wash.)

Equivalent terms

Washougal (Wash.)

Associated terms

Washougal (Wash.)

23 Archival description results for Washougal (Wash.)

Only results directly related

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1499. Repair, repaint inside and out and repair the doors and plumbing in the dwellings at 410 West 4th Street and 811 West 7th Street, Vancouver, Washington, to make them acceptable to tenant. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1585. Correspondence File Number 364-77. Vancouver Division. Other subject categories: Structure Dwellings.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 937. Purchase of baggage wagon for Washougal, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1067. Correspondence File Number 360. Vancouver Division. Other subject categories: Trucks Baggage.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1164. Construction of 1000 foot spur for feeding yard at Washougal, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1262. Correspondence File Number 360-1. Vancouver Division. Other subject categories: Tracks Spur.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, undated.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1625. Install two gates and wing fences at private crossing about 800 feet west of mile post 26, near Washougal, Washington, to prevent stock from getting on track. Vancouver Division. Other subject categories: Fence.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1379. Construct stock loading platform 12 feet by 600 feet with fencing and gates at spur track east of Washougal, Washington, to provide facilities for handling stock to and from W.H. Shepherd's yard, who will furnish all labor, sand, gravel and nails, Railway company to furnish balance of material. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1477. Correspondence File Number 360-1. Vancouver Division. Other subject categories: Structure Stock Platform.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1498. Special street assessment account improvement of Second Street from Russell Avenue to west line of Surber Avenue, Russell Avenue from Second Street north to town limits and the county road from Russell Street to east town limits, by grading and surfacing same with crushed rock to a width of 12 feet, at Washougal, Washington. Improvement ordered by town council by ordinance and work done under contract and cost assessed against abutting property. Chief Engineer/Standard Maintenance Procedure AFE Number RW T76. Correspondence File Number 360-X. Vancouver Division. Other subject categories: Assessment Road.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1510. Install a private crossing with two standard 14 foot gates, 865 feet east of milepost 29, for Mr. Sullenberger and take out the public crossing and cattle guards 2576 feet east of milepost 29 and connect up the right of way fences, near Washougal, Washington. Necessary grading to be done by Mr. Sullenberger. Correspondence File Number 360-4. Vancouver Division. Other subject categories: Crossing Road.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1656. Install model E5 Hayes derails on the stock yard spur and the west end of the Industrial siding at Washougal, Washington, to keep cars being moved on these tracks from getting onto main line. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1729. Correspondence File Number 360-1. Vancouver Division. Other subject categories: Track Derail.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washougal, Washington, 1915.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1297. Remove two Sanodor toilets and install two flush toilets in depot at Washougal, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1401. Correspondence File Number 360. Vancouver Division. Other subject categories: Plumbing Toilets.

Results 1 to 10 of 23