Color aerial postcard view of Warrenton, Oregon and marina, undated.
Elements area
Taxonomy
Code
Scope note(s)
Source note(s)
LC Name Authority: https://lccn.loc.gov/n82107415
LC Name Authority: https://lccn.loc.gov/n82107415
Color aerial postcard view of Warrenton, Oregon and marina, undated.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 65. Filling in temporary trestle at Hill Slough at Warrenton, Oregon. Portland Division. Other subject categories: Bridge.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1119. Constructing a 6 foot sidewalk across right of way at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1251. Correspondence File Number A330-X. Portland Division. Other subject categories: Sidewalk.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1274. Build 10 foot by 12 foot platform at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1377. Correspondence File Number A330. Portland Division. Other subject categories: Structure Platform.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1531. Construct spur track 3065 feet long to serve the Warrenton Clay Company's plant at Warrenton, Oregon, to furnish trackage facilities for new industry. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1625. Correspondence File Number A330-1. Portland Division. Other subject categories: Track Spur.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1386. Relay west leg of wye at Warrenton, Oregon, with 75 pound rail and tie plate same, account necessary to replace old 50 pound rail which is worn out. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1488. Correspondence File Number A330-2. Portland Division. Other subject categories: Tracks Rail Renewal.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1415. Install electric lights in depot at Warrenton for economy of operation and to decrease fire risk. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1523. Correspondence File Number A330 (?). Portland Division. Other subject categories: Lighting.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1172. Building 6 foot wood walk and turnstiles across right of way at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1275. Correspondence File Number A330-X. Portland Division. Other subject categories: Sidewalk.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1293. Build 234 foot spur track in East Third Street at East Alder Street to serve W.B. Clarke (?) Company at Portland. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1397. Correspondence File Number X368-1. Portland Division. Other subject categories: Tracks Spur.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1131. Rip Rap bank at end of culvert A-104-50, 1 1/2 miles east of Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1250. Correspondence File Number A50. Portland Division. Other subject categories: Rip Rap.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1151. Taking up old D.L. Kelly warehouse spur at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1257. Correspondence File Number A330-1. Portland Division. Other subject categories: Tracks Spur.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1292. Install pedestrian crossing across tracks on line of 8th Street in Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1398. Correspondence File Number A330-4. Portland Division. Other subject categories: Road Pedestrian Crossing.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1333. Relay west leg of Warrenton wye with 2nd hand 75 pound rail. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1267. Correspondence File Number A330-2. Portland Division. Other subject categories: Tracks Rail Replacement.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1280. Renew bridge number A-105-5 near Skipanon Creek at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1379. Correspondence File Number A34-S. Portland Division. Other subject categories: Bridge Renew.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 718. Building a 12 foot by 14 foot cook house for section gang at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 801. Correspondence File Number A330. Portland Division. Other subject categories: Structure Cook House.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 662. Filling in Market Street at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 743. Correspondence File Number A330-X. Portland Division. Other subject categories: Filling.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 751. Repairing roof and down spouts of depot at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 841. Correspondence File Number A330. Portland Division. Other subject categories: Structure Depot.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Warrenton, Oregon, 1912.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 344. Improving Railway Avenue and on 8 inches of dressing at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 401. Correspondence File Number A330-X. Portland Division. Other subject categories: Road Improvements.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 318. Strengthening draw bridge over Skipanon Creek at warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 375. Correspondence File Number A34. Portland Division. Other subject categories: Bridge Strengthening.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 333. Strengthening 60 foot wooden Howe Truss Bridge at Beaver Creek at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 396. Correspondence File Number A34. Portland Division. Other subject categories: Bridge Strengthening.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 353. Take up and load 5470 feet of track and 9 turnouts at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 351. Correspondence File Number A330. Portland Division. Other subject categories: Tracks Removal.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 167. 20 foot extension to car shops, 25 foot extension to track at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 212. Correspondence File Number A330. Portland Division. Other subject categories: Structure Shop Building.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 116. 510 foot house track at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 124. Portland Division. Other subject categories: Tracks House.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 45. 104 foot extension of spur track at Warrenton, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 53. Correspondence File Number A330-1. Portland Division. Other subject categories: Tracks Spur.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1372. Renew bridge number A-104-0, located 1.7 miles east of Warrenton, Oregon, with 17 spans standard pile trestle using present stringers, length 242 feet. To carry out work found necessary on bridge inspection and provided for on 1916 work sheet. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1471. Correspondence File Number A34-7. Portland Division. Other subject categories: Bridge Renewal.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1525. Place 15,000 No. 5 malleable tie plates on the renewed ties on the tangents between Goble Oregon and Warrenton, Oregon, to keep rails from cutting the new ties and for safe operation of traffic. Correspondence File Number A73 (?). Portland Division. Other subject categories: Tie Plates.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1626. Place 23,150 No. 5 tie plates on 75 pound rail between Goble, Oregon and Warrenton, Oregon. Necessary for safe operation of trains. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1701. Correspondence File Number A-73. Portland Division. Other subject categories: Tie Plate.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1504. Move a box car body from Flavel, Oregon, to Warrenton, for use as a bunk house for section men in order to release an outfit car now spurred out at Warrenton. Correspondence File Number A330. Portland Division. Other subject categories: Structure Bunk House.
Plat Map of Spokane, Portland, and Seattle Railway facilities at Warrenton, Oregon, April 23, 1915, Sheet Number 1, Line Segment 440, showing the Willbridge-Seaside line.