The Northern Pacific Depot at Toppenish, Washington, undated. The second depot is pictured. Located at Milepost 70.9.
Elements area
Taxonomy
Code
Scope note(s)
Source note(s)
LC Name Authority: https://lccn.loc.gov/n93096444
LC Name Authority: https://lccn.loc.gov/n93096444
The Northern Pacific Depot at Toppenish, Washington, undated. The second depot is pictured. Located at Milepost 70.9.
Plat Map of Northern Pacific facilities at Toston, Montana, October 12, 1953, Sheet Number 1, Line Segment 41, showing the Billings-Helena line.
Plat Map of Northern Pacific facilities at Toston, Montana, October 12, 1953, Sheet Number 2, Line Segment 41, showing the Billings-Helena line.
Plat Map of Northern Pacific facilities at Toston, Montana, October 12, 1953, Sheet Number 3, Line Segment 41, showing the Billings-Helena line.
Northern Pacific Engineering Drawing: Shop Plan - Girders, Bridge 195 - 6 - Mile Creek, west of Toston, Montana, Line Segment 041, Milepost 195.4. Sheet 1058 - 25, undated.
Northern Pacific Engineering Drawing: Shop Plan - Erection/Brace, Bridge 195 - 6 - Mile Creek, west of Toston, Montana, Line Segment 041, Milepost 195.4. Sheet 1058 - 25, undated.
Northern Pacific Engineering Drawing: Proposed Extension - Culvert, Culvert west of Toston, west of Toston, Montana, Line Segment 041, Milepost 197.5. Sheet 1266 - 24, 1945.
Northern Pacific Engineering Drawing: Plan/Detail Abutments, Bridge 203, west of Toston, Montana, Line Segment 041, Milepost 203.8. Sheet 441 - 56, undated.
Northern Pacific Engineering Drawing: Plan/Detail Abutments, Bridge 202 - Deep Creek, west of Toston, Montana, Line Segment 041, Milepost 202.0. Sheet 441 - 56, undated.
Northern Pacific Engineering Drawing: Masonry Detail/Pier/Abutment, Bridge 195 - 6 - Mile Creek, west of Toston, Montana, Line Segment 041, Milepost 195.4. Sheet 1058 - 25, undated.