Northern Pacific Engineering Drawing: Tie Plan, Bridge 11.2 - Silver Bow Creek, north of Silver Bow, Montana, Line Segment 327, Milepost 11.9. Sheet 446 - 61, 1956. Note: Timber bridge
Elements area
Taxonomy
Code
Scope note(s)
Source note(s)
LC Name Authority: https://lccn.loc.gov/nr2001050061