- US WaBuPNRA D0027-004-009-008-001-BB017689
- Item
- undated
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Bent and Abutment Details, Bridge 6, Silver Bow, Montana, Line Segment 327, Milepost 6.9. Sheet 1274 - 2, undated.
9 results directly related Exclude narrower terms
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Bent and Abutment Details, Bridge 6, Silver Bow, Montana, Line Segment 327, Milepost 6.9. Sheet 1274 - 2, undated.
Northern Pacific Engineering Drawing: Concrete Trestle, Bridge 8, North of Silver Bow, Montana, 1918
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Concrete Trestle, Bridge 8, north of Silver Bow, Montana, Line Segment 327, Milepost 8.9. Sheet 1058 - 8, 1918. Note: Concrete trestle
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Detail of Abutments, Bridge 11.1 - Lolo River, north of Silver Bow, Montana, Line Segment 327, Milepost 11.5. Sheet 441 - 68, undated. Note: Steel span
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: General Plan, Bridge 11 - Silver Bow Creek, west of Silver Bow, Montana, Line Segment 327, Milepost 11.3. Sheet 1060 - 34, 1953. Note: Pile trestle
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Proposed Concrete Trestle, Bridge 6, Silver Bow, Montana, Line Segment 327, Milepost 6.9. Sheet 1274 - 2, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Proposed Concrete Trestle, Bridge 6, Silver Bow, Montana, Line Segment 327, Milepost 6.9. Sheet 1274 - 2, undated. Note: Concrete trestle
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Proposed Concrete Trestle, Bridge 6A, Silver Bow, Montana, Line Segment 327, Milepost 6.9. Sheet 1274 - 2, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Tie Plan, Bridge 11.1 - Lolo River, north of Silver Bow, Montana, Line Segment 327, Milepost 11.5. Sheet 441 - 68, 1952.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Tie Plan, Bridge 11.2 - Silver Bow Creek, north of Silver Bow, Montana, Line Segment 327, Milepost 11.9. Sheet 446 - 61, 1956. Note: Timber bridge