- US WaBuPNRA D0027-001-009-008-001-BB023157
- Item
- 1974
Part of Timothy Miller Collection
Burlington Northern Engineering Drawing: Deck Plan, Bridge E71.6 - Mill Creek, south of Salem, Oregon, Line Segment 442, Milepost 71.26. Sheet, 1974.
38 results directly related Exclude narrower terms
Part of Timothy Miller Collection
Burlington Northern Engineering Drawing: Deck Plan, Bridge E71.6 - Mill Creek, south of Salem, Oregon, Line Segment 442, Milepost 71.26. Sheet, 1974.
Part of Timothy Miller Collection
Burlington Northern Engineering Drawing: Deck Plan, Bridge E74.8 - County Road, south of Salem, Oregon, Line Segment 442, Milepost 74.75. Sheet 310 - 6608 - 4, 1972.
Part of Timothy Miller Collection
Burlington Northern Engineering Drawing: General Plan, Bridge E74.8 - County Road, south of Salem, Oregon, Line Segment 442, Milepost 74.75. Sheet 310 - 6608 - 1, 1972.
Part of Timothy Miller Collection
Spokane, Portland and Seattle Railway Engineering Drawing: 40 Foot Railroad Crossing Arch, Concrete Arch, Salem, Oregon, Line Segment 442. Sheet WX - 125, undated.
Part of Timothy Miller Collection
Spokane, Portland and Seattle Railway Engineering Drawing: Bent Movement, Bridge E71.8 - County Road, south of Salem, Oregon, Line Segment 442, Milepost 71.70. Sheet SS - 640, undated.
Part of Timothy Miller Collection
Spokane, Portland and Seattle Railway Engineering Drawing: Bent Movements, Bridge E71.8 - County Road, south of Salem, Oregon, Line Segment 442, Milepost 71.70. Sheet SS - 640C, undated.
Part of Timothy Miller Collection
Spokane, Portland and Seattle Railway Engineering Drawing: Bill of Material Reinforcement Steel, Bridge E71.3S - Mill Race, south of Salem, Oregon, Line Segment 442. Sheet SS - 437A, undated.
Part of Timothy Miller Collection
Spokane, Portland and Seattle Railway Engineering Drawing: Bridge Site, Bridge E71.6 - Mill Creek, south of Salem, Oregon, Line Segment 442, Milepost 71.26. Sheet T - 6 - 15, undated.
Part of Timothy Miller Collection
Spokane, Portland and Seattle Railway Engineering Drawing: Cast Steel Pedestal, Bridge E71.6 - Mill Creek, south of Salem, Oregon, Line Segment 442, Milepost 71.26. Sheet SS - 443, undated.
Part of Timothy Miller Collection
Spokane, Portland and Seattle Railway Engineering Drawing: Concrete Backwall, Bridge E71.6 - Mill Creek, south of Salem, Oregon, Line Segment 442, Milepost 71.26. Sheet WX - 148, undated.