- US WaBuPNRA D0027-004-009-008-005-BB028887
- Item
- undated
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Replace Steel Bents, Signal Bridge, Tacoma, Washington, Line Segment 051, Milepost 39.73. Sheet 131170, undated.
2 results directly related Exclude narrower terms
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Replace Steel Bents, Signal Bridge, Tacoma, Washington, Line Segment 051, Milepost 39.73. Sheet 131170, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: 3 - Track Signal Bridge, Signal Bridge, Tacoma, Washington, Line Segment 051, Milepost 39.73. Sheet 424 - 4, undated.