Railroads--Management

Elements area

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

    Hierarchical terms

    Railroads--Management

    Equivalent terms

    Railroads--Management

    • UF Railroad project documents

    • UF Authorization documents

    Associated terms

    Railroads--Management

      73 Archival description results for Railroads--Management

      73 results directly related Exclude narrower terms
      US WaBuPNRA D0261A-002-1485 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1485. Take box car body from Flavel, Oregon, and place it on the depot grounds at Astoria for laborers' quarters. Correspondence File Number A328. Portland Division. Other subject categories: Structure Laborer Quarters.

      US WaBuPNRA D0261A-002-1448 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1448. Complete the fill under all tracks in Units 1 and 2, Astoria Reclamation District, from station 5229 + 10 to station 5296 + 10, to do away with heavy maintenance. Work provided for by 1916 work sheet. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1543. Correspondence File Number A328-7A. Portland Division. Other subject categories: Filling.

      US WaBuPNRA D0261A-002-1544 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1544. Payment special assessment levied by City of Astoria account improvement Commercial Street by filling with sand between wooden retaining walls, and planking and constructing wooden sidewalks, East line 17th Street to West line 22nd Street. Chief Engineer/Standard Maintenance Procedure AFE Number RW T85. Correspondence File Number A328-X. Portland Division. Other subject categories: Assessment.

      US WaBuPNRA D0261A-002-1725 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1725. Make fill for full width of right of way across 12th Street in Astoria, Oregon, to provide public crossing and avoid building a timber viaduct. THIS CANCELS AFE No. 1607. Portland Division. Other subject categories: Filling.

      US WaBuPNRA D0261A-002-1021 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1021. Constructing spur 280 feet long on pile trestle 1 1/2 mile east of Astoria, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1153. Correspondence File Number A328-1PA. Portland Division. Other subject categories: Tracks Spur.

      US WaBuPNRA D0261A-002-1545 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1545. Connect toilets in passenger depot, (furnishing and placing additional fittings) with city sewer system at Astoria, Oregon. Necessary to provide permanent sewer connection before the filling is completed under the tracks as toilets at present are connected with temporary box leading to the river. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1631. Correspondence File Number A328. Portland Division. Other subject categories: Sewer.

      US WaBuPNRA D0261A-002-1564 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1564. Lay 650 feet of 3 inch galvanized pipe from exchange street down 12th Street to freight house, Astoria, Oregon, account fill put in by City broke four inch pipe and repairs to same are impossible and present two inch pipe being used does not furnish sufficient pressure for fire protection. Portland Division. Other subject categories: Lines Water.

      US WaBuPNRA D0261A-002-1700 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1700. Payment of special street assessment account improvement of 11th Street from south line of SP&S R/W to north line of Exchange Street by constructing 855 lineal feet of timber viaduct with hard surface pavement, Astoria, Oregon. Correspondence File Number A328-X. Portland Division. Other subject categories: Assesment.

      US WaBuPNRA D0261A-002-1850 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1850. Renew bridge A-100-4 west of 11th Street with standard pile trestle; renew turnouts to spur tracks. Correspondence File Number A34-7. Portland Division. Other subject categories: Bridge Trestle.

      US WaBuPNRA D0261A-002-1225 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1225. Remove stringers from filled portion of Bridge A-102-6 adjacent to property of the Port of Astoria, length of filled portion 1030 feet. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1318. Correspondence File Number A328-A (?). Portland Division. Other subject categories: Bridge Filling.

      US WaBuPNRA D0261A-002-1322 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1322. Special assessment account of filling in Reclamation & Improvement District Number 2 at Astoria. Chief Engineer/Standard Maintenance Procedure AFE Number RW T56. Correspondence File Number A328-7A. Portland Division. Other subject categories: Assessment Filling.

      US WaBuPNRA D0261A-002-1554 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1554. Payment of special assessment account improvement of 9th Street from south line Dunne Street to south line SP&S right of way by constructing retaining walls, filling and planking, at Astoria, Oregon. . Portland Division. Other subject categories: Assessment.

      US WaBuPNRA D0261A-002-1467 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1467. Installation of electric lights in and around roundhouse at Astoria. Safety first feature. Should have electric lights to increase efficiency of workman and lessening danger. Chief Engineer/Standard Maintenance Procedure AFE Number SMP 153. Correspondence File Number A328-3. Portland Division. Other subject categories: Lighting.

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 619. Taking up old scale and putting track in shape at Astoria, Oregon. Correspondence File Number A328-6. Portland Division. Other subject categories: Scale Track.

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 741. Construction of a 250 foot extension to spur track at Astoria, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 837. Correspondence File Number A332-1. Portland Division. Other subject categories: Tracks Spur.

      US WaBuPNRA D0261A-002-1012 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1012. Installing drinking fountain in depot at Astoria. Correspondence File Number A328-9. Portland Division. Other subject categories: Plumbing Drinking Fountain.

      US WaBuPNRA D0261A-002-1972 · Item · 1917-06-11
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1972. Special assesment acount Reclamation and Improvement District. Chief Engineer/Standard Maintenance Procedure AFE Number T-114 (?). Correspondence File Number A328-7A. Portland Division. Other subject categories: Assesment.

      US WaBuPNRA D0261A-002-1991 · Item · 1917-06-25
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1991. Assesment for street improvements. Chief Engineer/Standard Maintenance Procedure AFE Number T115. Correspondence File Number A328-X. Portland Division. Other subject categories: Assesment.

      US WaBuPNRA D0261A-002-1995 · Item · 1917-06-25
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1995. Replace needle beam at lower end of dock. Chief Engineer/Standard Maintenance Procedure AFE Number CE 2014. Correspondence File Number A328-D. Portland Division. Other subject categories: Dock.

      US WaBuPNRA D0261A-002-1967 · Item · 1917-06-01
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1967. Purchase seven portable bunk house buildings from Porter Brothers Co. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1990. Correspondence File Number 51-3. Portland Division. Other subject categories: Structures Bunkhouses Portable.

      US WaBuPNRA D0261A-002-1782 · Item · 1917
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1782. Payment of special assessment account improvement Franklin Avenue from west line of Adair's Port of Upper Astoria to east line of 36th Street and 36th Street from north line of Franklin Avenue to south line of Duane Street and Duane Street from west line of 36th Street to east line of 37th Street and 37th Street from north line of Duane Street to a point 69 foot south of south line Commercial Street by grading, paving and constructing concrete curbs and sidewalks, Astoria, Oregon. Correspondence File Number A328-X. Portland Division. Other subject categories: Assessment .

      US WaBuPNRA D0261A-002-1851 · Item · 1917-02-27
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1851. Renew bridge A-101-1 with standard pile trestle. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1893. Correspondence File Number A34-7. Portland Division. Other subject categories: Bridge Trestle.

      US WaBuPNRA D0261A-002-1742 · Item · 1917-01-10
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1742. Payment of special street assessment account improvement Commercial Street from east line 10th Street to east line 17th Street by removing all old material and constructing a timber viaduct, concrete curbs, concrete walk, tile walls and bitulithic pavement, Astoria, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number RW T99. Correspondence File Number A328-X. Portland Division. Other subject categories: Assessment.

      US WaBuPNRA D0261A-002-1780 · Item · 1917
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1780. Payment of special assessment for improvement of Bond Street from the east line of Tenth Street to east line of Fourteenth Street, by removing all old material and by constructing a timber viaduct, concrete curbs, concrete walks, tile walls and bithulithic pavement. Chief Engineer/Standard Maintenance Procedure AFE Number RW T106. Correspondence File Number A328-X. Portland Division. Other subject categories: Assessment.

      US WaBuPNRA D0261A-002-1806 · Item · 1917-02-20
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1806. Special assesment Second Street improvements. Chief Engineer/Standard Maintenance Procedure AFE Number RW T105. Correspondence File Number A328-X. Portland Division. Other subject categories: Assesment.

      US WaBuPNRA D0261A-002-1703 · Item · 1916-12-20
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1703. Complete the fill under all tracks in Units 1 and 2, Astoria Reclamation District, from station 22 plus 06.6 to station 59 plus 04.6; also to complete fill to present street grade of that portion around the passenger depot from SP&S tracks to the south right of way line, between a line through the east end of the depot and the west line of 12th Street. This filling will do away with heavy maintenance. Work is provided for by 1917 work sheet. THIS AFE CANCELS AFE PRESIDENT'S No. 1448. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1783. Correspondence File Number A328-7A. Portland Division. Other subject categories: Filling.

      US WaBuPNRA D0261A-002-1527 · Item · 1916-06-22
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1527. Build a spur track 285 feet long opposite the O-WRR&N dock at Astoria, Oregon, for the Union Meat Company Work to be done under standard side track agreement. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1614. Correspondence File Number A328-1UM. Portland Division. Other subject categories: Track Spur.

      US WaBuPNRA D0261A-002-1657 · Item · 1916-11-28
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1657. Extend the horizontal pipe on the water crane 18 inches in yard at Astoria, Oregon, to allow engines to take water from the oil spur and prevent fouling the main line as they do at present. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1734. Correspondence File Number A328-9. Portland Division. Other subject categories: Water Supply.

      US WaBuPNRA D0261A-002-1515 · Item · 1916-05-29
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1515. Extend the Astoria Box Company's spur 50 feet and install bumper on trestle, at Astoria, Oregon. Work to be done under the standard side track agreement. Applicant's part $23.87; Co's part $26.13. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1603. Correspondence File Number A328-1. Portland Division. Other subject categories: Track Spur.