Railroads--Management

Elements area

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

    Hierarchical terms

    Railroads--Management

    Equivalent terms

    Railroads--Management

    • UF Railroad project documents

    • UF Authorization documents

    Associated terms

    Railroads--Management

      12 Archival description results for Railroads--Management

      12 results directly related Exclude narrower terms
      US WaBuPNRA D0261A-002-82 · Item · 1909-09-18
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 82. 4000 foot passing track at Kennewick, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 85. Correspondence File Number 323. Vancouver Division. Other subject categories: Tracks Passing.

      US WaBuPNRA D0261A-002-291 · Item · 1911-04-13
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 291. Construction of right of way fence for property of G.E. Edwards at Kennewick, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 350. Correspondence File Number 13-1. Vancouver Division. Other subject categories: Fencing.

      US WaBuPNRA D0261A-002-767 · Item · 1913-08-05
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 767. Grade crossing at 5th Avenue, making 24 foot roadway at Kennewick, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 789. Correspondence File Number 323-4. Vancouver Division. Other subject categories: Crossing.

      US WaBuPNRA D0261A-002-876 · Item · 1914-01-05
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 876. Relocating North Coast Railroad line and separation of grade at Kennewick, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 958. Correspondence File Number 69-4. Vancouver Division. Other subject categories: Tracks relocating.

      US WaBuPNRA D0261A-002-100 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 100. 309 foot spur track for Eschbach-Bruce Company at Kennewick, Washington. Correspondence File Number 323-1. Vancouver Division. Other subject categories: Tracks Spur.

      US WaBuPNRA D0261A-002-72 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 72. 80 foot extension on each end of depot platform at Kennewick, Washington. Correspondence File Number 323. Vancouver Division. Other subject categories: Platform.

      US WaBuPNRA D0261A-002-1621 · Item · undated
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1621. Install temporary crossover between main line and passing track at Kennewick, Washington, and removing same after it has served its purpose, account necessary to provide greater clearance at bridge pier which O-WRR&N Company will build in bridge No. 228-4 during construction period. Total amount is to be paid by the General Construction Company, as per their letter to A.M. Lapfer dated October 3, 1916. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1696. Correspondence File Number 69-4. Vancouver Division. Other subject categories: Track Crossover.