Railroads--Management

Elements area

Taxonomy

Code

DXXXX-XXX-002

Scope note(s)

  • At Pacific Northwest Railroad Archive, documents used in managing the operation and maintenance of railroads, specifically including Authorization for Expenditure (AFE), Bulletin, Field Completion Report, Request for Authorization (RFA), Work Order

Source note(s)

Display note(s)

    Hierarchical terms

    Railroads--Management

    Equivalent terms

    Railroads--Management

    • UF Railroad project documents

    • UF Authorization documents

    Associated terms

    Railroads--Management

      152867 Archival description results for Railroads--Management

      152865 results directly related Exclude narrower terms
      US WaBuPNRA D0261A-002-1156 · Item · 1915-04-02
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1156. Extension 40 feet by 44 feet to rear of present stockyard at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1268. Correspondence File Number 313. Vancouver Division. Other subject categories: Structure Stock Yard.

      US WaBuPNRA D0261A-002-969 · Item · 1914-04-15
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 969. Repairs to bridge 291-4 at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1099. Correspondence File Number 34-2. Vancouver Division. Other subject categories: Bridge Repairing.

      US WaBuPNRA D0261A-002-765 · Item · 1913-08-05
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 765. Replacement of trestle at bridge 291-4 with steel and concrete at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 816. Correspondence File Number 33-2OB. Vancouver Division. Other subject categories: Trestle Replacing.

      US WaBuPNRA D0261A-002-313 · Item · 1911-06-01
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 313. Grading of crossing on industrial spur at Canal Street at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 376. Correspondence File Number 313-1. Vancouver Division. Other subject categories: Road Crossing.

      US WaBuPNRA D0261A-002-260 · Item · 1911-01-20
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 260. Installing air sand hoist at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 317. Correspondence File Number 313-3. Vancouver Division. Other subject categories: Structure Sand Hoist.

      US WaBuPNRA D0261A-002-266 · Item · 1911-01-28
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 266. Building bridge on spur track and rebuilding of 1075 feet of ditch at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 323. Correspondence File Number 313-7P. Vancouver Division. Other subject categories: Bridge Construction.

      US WaBuPNRA D0261A-002-393 · Item · 1911-10-28
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 393. Extending present spur 60 feet at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 466. Correspondence File Number 313-1. Vancouver Division. Other subject categories: Tracks Spur.

      US WaBuPNRA D0261A-002-237 · Item · 1910-10-27
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 237. Siding at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 286. Correspondence File Number 313. Vancouver Division. Other subject categories: Tracks Siding.

      US WaBuPNRA D0261A-002-208 · Item · 1910-09-02
      Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

      Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 208. Switching spur at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 260. Correspondence File Number 303-1. Vancouver Division. Other subject categories: Tracks Spur.