Portland (Or.)

Elements area

Taxonomy

Code

Scope note(s)

    Source note(s)

    Display note(s)

      Hierarchical terms

      Portland (Or.)

      Portland (Or.)

      Equivalent terms

      Portland (Or.)

      • UF Portland, Oregon

      Associated terms

      Portland (Or.)

        2163 Archival description results for Portland (Or.)

        2119 results directly related Exclude narrower terms
        US WaBuPNRA D0261A-002-1615 · Item · 1916-10-14
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1615. Filling 1100 lineal feet of bridge No. 8-3-S on stock yard spur at North Portland, Oregon, from elevation 28 to track level, remove stringers, complete track and protect fill, Trestle and spur are owned jointly by SP&S and O-WRR&N Co., each bearing 50% of expense. The portion of trestle up to elevation 28 was filled under AFE 1449. Necessary to fill trestle to do away with heavy repairs. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1646. Correspondence File Number 365-1U. Terminals Division. Other subject categories: Bridge Filling.

        US WaBuPNRA D0261A-002-1869 · Item · 1917-03-06
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1869. Fill bridge 8-3-S on stockyard spur, length of trestle 988'. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1898. Correspondence File Number 365-1U. Terminals Division. Other subject categories: Bridge Filling.

        US WaBuPNRA D0261A-002-1397 · Item · undated
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1397. Fill right of way to elevation 28 for a length of 1,000 feet under bridge number 8-3 at North Portland, account necessary to strengthen bridge and bring right of way to same elevation to which adjacent property is being raised. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1500. Correspondence File Number 34-1SL. Terminals Division. Other subject categories: Bridge Filling.

        US WaBuPNRA D0261A-002-819 · Item · 1913-09-24
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 819. Tie plating double track from City Limits to Willbridge, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 919. Correspondence File Number 73-1. Terminals Division. Other subject categories: Tracks Tie Plates.

        US WaBuPNRA D0261A-002-986 · Item · 1914-05-16
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 986. Reconstruction of telegraph line from City Limits to Willbridge, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1118. Correspondence File Number 10-1. Terminals Division. Other subject categories: Telegraph Line.

        US WaBuPNRA D0261A-002-668 · Item · 1913-04-04
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 668. Ballasting double track between City Limits and Willbridge. Chief Engineer/Standard Maintenance Procedure AFE Number CE 701. Correspondence File Number 12-1. Terminals Division. Other subject categories: Ballasting.

        US WaBuPNRA D0261A-002-1481 · Item · 1916-04-26
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1481. Rebuild 16,845 lineal feet of right of way fence and repair 10,700 lineal feet of right of way fence between milepost 4 and milepost 40 and add one wire to fence on each side of track between milepost 4 and milepost 11, Portland, Oregon to Goble, Oregon, to keep stock off track and the one wire is added on this section because there are only three wires on the fence at present. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1571. Correspondence File Number A13. Terminals Division. Other subject categories: Fencing.

        US WaBuPNRA D0261A-002-1808 · Item · 1917-02-20
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1808. Place standard culvert signs at all culverts. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1852. Correspondence File Number A50. Portland Division. Other subject categories: Signs Culvert.

        US WaBuPNRA D0261A-002-201 · Item · 1910-08-09
        Part of Spokane, Portland, and Seattle Railway Authority for Expenditure Collection

        Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 201. Additional copper telephone circuit Portland, Oregon to Vancouver, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 253. Correspondence File Number 10-1. Terminals Division. Other subject categories: Communication Telephone & Telegraph Lines.