Lyle (Wash.)

Taxonomy

Code

Scope note(s)

Source note(s)

  • Taken From list of SP&S Stations and Spurs.

Display note(s)

Hierarchical terms

Lyle (Wash.)

Lyle (Wash.)

Equivalent terms

Lyle (Wash.)

Associated terms

Lyle (Wash.)

81 Archival description results for Lyle (Wash.)

81 results directly related Exclude narrower terms

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Lyle, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1608. CREDIT - Amount received from Union Meat Company as purchase price of that certain wooden building known as the old Columbia River & Northern engine house, located at Lyle, Washington, transferred by bill of sale dated August 30, 1916. Building not required for operating purposes. Chief Engineer/Standard Maintenance Procedure AFE Number RW 36. Correspondence File Number 351-7. Vancouver Division. Other subject categories: Structure Engine House.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Lyle, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1611. Build 110 foot extension to Union Meat Company spur at Lyle, Washington, to provide trackage for new grain warehouse to be built. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1672. Correspondence File Number 351-1. Vancouver Division. Other subject categories: Track Spur.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Lyle, Washington, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1918. Place station lamps on posts. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1950. Correspondence File Number 351. Other subject categories: Lighting.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Lyle, Washington, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1878. Install warning signs at three highway crossings. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1929. Correspondence File Number G37-4. Other subject categories: Crossing Signs.

Results 31 to 40 of 81