Northern Pacific Engineering Drawing: Shop Plan - Drawbridge, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.
Northern Pacific Engineering Drawing: Shop Plan - Drawbridge, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.
Northern Pacific Engineering Drawing: Shop Plan - End Posts, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.
Northern Pacific Engineering Drawing: Shop Plan - Floor Beam and Bill of Material, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.
Northern Pacific Engineering Drawing: Shop Plan - Floor Beam/Bents, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.
Northern Pacific Engineering Drawing: Shop Plan - Floor Beam/Lateral, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.
Northern Pacific Engineering Drawing: Shop Plan - Floor Beam/Stringer, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6. Sheet 292 - C - 7, undated.
Northern Pacific Engineering Drawing: Shop Plan - Floor Beam/Stringer, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.
Northern Pacific Engineering Drawing: Shop Plan - Foundation Plans, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6. Sheet 292 - E - 2, undated.
Northern Pacific Engineering Drawing: Shop Plan - Frame Lock Line, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.
Northern Pacific Engineering Drawing: Shop Plan - Front Lock, Bridge 0.59 - Cowlitz River, Longview Junction, Washington, Line Segment 613, Milepost 0.6, undated.