Spokane, Portland, and Seattle Railway Engineering Drawing: unnamed structure at Moody, Oregon, prepared in 1984. Burlington Northern File Number 12029, Reference Number 10106, Sheet 002.
Spokane, Portland, and Seattle Railway Engineering Drawing: unnamed structure at Moody, Oregon, prepared in 1984. Burlington Northern File Number 12029, Reference Number 10108, Sheet 004.
Spokane, Portland, and Seattle Railway Engineering Drawing: unnamed structure at Moody, Oregon, prepared in 1984. Burlington Northern File Number 12029, Reference Number 10108, Sheet 003.
Spokane, Portland, and Seattle Railway Engineering Drawing: unnamed structure at Moody, Oregon, prepared in 1984. Burlington Northern File Number 12029, Reference Number 10108, Sheet 001.
Spokane, Portland, and Seattle Railway Engineering Drawing: unnamed structure at Moody, Oregon, prepared in 1981. Burlington Northern File Number 12029, Reference Number 10109, Sheet A-1.
Spokane, Portland and Seattle Railway Engineering Drawing: Plan and Profile, Bridge T4.9 - Underpass, Moody, Oregon, Line Segment 053, Milepost 4.89. Sheet NO - 409, 1957. Note: Steel span (not done ?)
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1738. Furnish heating stoves for section houses, Oakbrook, Oregon, Moody, Oregon and Opal City, Oregon. Necessary to furnish heat as these section houses have never had stoves heretofore. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1793. Correspondence File Number T-17. Oregon Trunk Division. Other subject categories: Structure Section House Stoves.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1723. Build a 270 foot spur to sand pit of Malcolm A. Moody, at Moody, Oregon. Ry Co's part 398.32; applicant's part 186.68. Necessary to provide track for loading and shipping sand. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1773. Correspondence File Number T302-1. Oregon Trunk Division. Other subject categories: Track Spur.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Moody Celilo, Oregon, 1912.
Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1263. Replacing wooden culvert with 54 inch concrete pipe at Moody, Oregon. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1359. Correspondence File Number T50. Oregon Trunk Division. Other subject categories: Culvert.