Showing 23 results

Archival description
Tonga (Wash.)
Print preview View:

Great Northern Railway Authorization for Expenditure (AFE) 17241, Tonga, Washington, 1910.

AFE 17241, Tonga, Washington, 1910. 1 Mile West of Tonga, Replace Pile and Timber Bridge No 417 1/2 withSteel Bridge. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $4550. Series I. Lines West. Cascade Division. Other Subject Categories: Structures, Bridges

Great Northern Railway Authorization for Expenditure (AFE) 20500, Tonga, Washington, 1912.

AFE 20500, Tonga, Washington, 1912. Replace Present Pile Bridge No 417 Main Line 131 Feet Long withSteel and Pile Bridge 156 Feet Long - 1/2 Mile West of Tonga. Interstate Commerce Commission Account Number 6, Bridges, Trestles, Culverts. Cost: $10760. Series I. Lines West. Cascade Division. Other Subject Categories: Structures, Bridges

Great Northern Railway Authorization for Expenditure (AFE) 20511, Tonga, Washington, 1912.

AFE 20511, Tonga, Washington, 1912. Extend 495 Foot Extension to West End of Passing Track, and Set Out Spur 500 Foot Long. Interstate Commerce Commission Account Number 12, Track Laying and Surfacing. Cost: $3259. Series I. Lines West. Cascade Division. Other Subject Categories: Track, Passing

Great Northern Railway Authorization for Expenditure (AFE) 21542, Tonga, Washington, 1922.

AFE 21542, Tonga, Washington, 1922. Retirement of Depot and Toilet Totally Destroyed by Fire July 24th, and Not to Be Replaced. Interstate Commerce Commission Account Number 16, Station and Office Buildings. Cost: $734. Series II. Lines West. Cascade Division. Other Subject Categories: Depots, Combination

Great Northern Railway Authorization for Expenditure (AFE) 2202, Tye, Washington, 1916.

AFE 2202, Tye, Washington, 1916. Construct 3095 Lineal Ft Single Track and 1966 Lineal FeetDouble Track New Timber Snow Shed; Renew in Kind 96 Lineal FeetSingle Track Snow Shed; Gravity Water Supply for Pipe Line for The Above New Timber Snow Shed. Interstate Commerce Commission Account Number 12 Track Laying and Surfacing Cost: $247000. Series II. Lines West. Cascade Division. Other Subject Categories: Track, Mainline

Results 1 to 10 of 23