Spokane, Portland and Seattle Railway Engineering Drawing: Pier and Abutment Alterations, Bridge A35.5 (151) - Tide Creek, west of Reichhold, Oregon, Line Segment 440, Milepost 35.45. Sheet PQ 358 - A, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Pier Alterations, Bridge A34.4 - Merrill Creek, west of Reichhold, Oregon, Line Segment 440, Milepost 34.36. Sheet N - 3 - 15, 1958.
Spokane, Portland and Seattle Railway Engineering Drawing: Pier 2, Bridge 10.8 - 26th Street, Vancouver, Washington, Line Segment 047, Milepost 10.78. Sheet 362 - 8103, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Pier 2, Bridge 10.8 - 26th Street, Vancouver, Washington, Line Segment 047, Milepost 10.78. Sheet 362 - 8103 - 6, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Pier 2 Details, Bridge E66.6 - Salem Parkway, south of Hopmere, Oregon, Line Segment 442, Milepost 66.60. Sheet 296 - 8431 - 10, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Perspective Views, Bridge T0.4 - Columbia River, south of Wishram, Washington, Line Segment 053, Milepost 0.37. Sheet WX - 208, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Pedestal Rail/Expansion Bearing, Bridge E66.6 - Salem Parkway, south of Hopmere, Oregon, Line Segment 442, Milepost 66.60. Sheet 296 - 8431 - 6, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Pedestal for Frame Bents, Bridge E98.6 - Calapooia River, south of Albany, Oregon, Line Segment 442, Milepost 99.87, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Partial Deck Renewal, Bridge T0.4 - Columbia River, south of Wishram, Washington, Line Segment 053, Milepost 0.37. Sheet 324 - 6094 - 2, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Panel Brace and Details, Bridge 5.1 - Willamette River, north of Willbridge, Oregon, Line Segment 047, Milepost 5.15. Sheet 231 - 7065 - 7, undated.