Spokane, Portland and Seattle Railway Engineering Drawing: Renew Bridge, Bridge A29.4S, west of Saint Helens, Oregon, Line Segment 440, Milepost 0.40. Sheet WX - 224, 1958.
Spokane, Portland and Seattle Railway Engineering Drawing: Renew Bents, Bridge S - 31.3 - Wylie Creek, Foster, Oregon, Line Segment 457, Milepost 31.29. Sheet WX - 155A, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Renew Base Plate, Bridge 42.7 - Duncan Creek, east of Skamania, Washington, Line Segment 047, Milepost 42.67. Sheet NO 452, 1963. Note: Steel span
Spokane, Portland and Seattle Railway Engineering Drawing: Remodel Houses, Bridge 5.1 - Willamette River, north of Willbridge, Oregon, Line Segment 047, Milepost 5.15. Sheet NO - 414, 1962.
Spokane, Portland and Seattle Railway Engineering Drawing: Remodel House, Bridge 9.6 - Columbia River, Vancouver, Washington, Line Segment 047, Milepost 9.31. Sheet 00 - 414, 1962.
Spokane, Portland and Seattle Railway Engineering Drawing: Relocation, Bridge 190.6 - Four Mile Canyon, east of Paterson, Washington, Line Segment 047, Milepost 190.59. Sheet MDR - 1 - 0 - 7/27&, 1949. Note: Steel span (relocation)
Spokane, Portland and Seattle Railway Engineering Drawing: Relocation, Bridge 182.8 - Underpass, east of Plymouth, Washington, Line Segment 047, Milepost 194.83. Sheet 1 - 0 - 7/29.2A, 1950.
Spokane, Portland and Seattle Railway Engineering Drawing: Relocation, Bridge 182.8 - Underpass, east of Plymouth, Washington, Line Segment 047, Milepost 192.80. Sheet ML - 192 - 8, 1949. Note: Concrete arch (relocation)
Spokane, Portland and Seattle Railway Engineering Drawing: Reinforcing Bars, Scale, Albany, Oregon, Line Segment 442. Sheet 237 - 6757 - 3, undated.
Spokane, Portland and Seattle Railway Engineering Drawing: Reinforcement Schedule, Bridge T0.4 - Columbia River, south of Wishram, Washington, Line Segment 053, Milepost 0.37. Sheet WX - 209, undated.