Camas Prairie Railroad Engineering Drawing: Falsework Plan, Bridge 19 (16), south of Culdesac, Idaho, Line Segment 460. Sheet 424 - 10, undated.
Camas Prairie Railroad Engineering Drawing: Falsework Tie Plan, Bridge 19 (16), south of Culdesac, Idaho, Line Segment 460. Sheet 424 - 10, undated.
Camas Prairie Railroad Engineering Drawing: Falsework, Bridge 126 - Clearwater River, Spalding, Idaho, Line Segment 459. Sheet 442 - 64, 1914.
Camas Prairie Railroad Engineering Drawing: Fascia Beam/Handrail, Bridge 25.25 - Pedestrian Underpass, Ahsahka, Idaho, Line Segment 461, Milepost 25.25. Sheet 2017 - 7, undated.
Camas Prairie Railroad Engineering Drawing: Floor Beam/Stringer, etc., Bridge 50.1 - Clearwater River, south of Tramway, Idaho, Line Segment 461. Sheet 442 - 18, undated.
Camas Prairie Railroad Engineering Drawing: Floor Beam/Stringer/Bearings, Bridge 94.1 (303) - Lightning Creek, west of Eddy, Idaho, Line Segment 044, Milepost 94.3. Sheet 785 - 15, undated.
Camas Prairie Railroad Engineering Drawing: Floorbeam - 160 Foot Through Truss, Bridge 25 - North Fork of the Clearwater River, east of Ahsahka, Idaho, Line Segment 461. Sheet 1072 - 8, undated.
Camas Prairie Railroad Engineering Drawing: Foundation Investigation, Bridge 26 - Quartz Creek, Quartz, Idaho, Line Segment 462. Sheet 1075 - 70, undated.
Camas Prairie Railroad Engineering Drawing: Foundation Investigation, Bridge 27 (58) - Quartz Creek, east of Quartz, Idaho, Line Segment 462. Sheet 1075 - 71, undated.
Camas Prairie Railroad Engineering Drawing: General and Deck Plan, Bridge 17 (29) - Orofino Creek, east of Rudo, Idaho, Line Segment 462. Sheet 1075 - 45, 1926. Note: Timber bridge