- US WaBuPNRA BB031511
- Item
- undated
Milwaukee Road Engineering Drawing: Pier, Bridge 2153.8 - Cedar River, west of Trude, Washington, Line Segment 397, Milepost 2153.8. Sheet 391 - 8640 - 8, undated.
37 results with digital objects Show results with digital objects
Milwaukee Road Engineering Drawing: Pier, Bridge 2153.8 - Cedar River, west of Trude, Washington, Line Segment 397, Milepost 2153.8. Sheet 391 - 8640 - 8, undated.
Milwaukee Road Engineering Drawing: Pier, Bridge 2153.8 - Cedar River, west of Trude, Washington, Line Segment 397, Milepost 2153.8. Sheet 391 - 8640 - 3, undated.
Milwaukee Road Engineering Drawing: Pedestal Bearings, Bridge 5.2 (FF912) - Snoqualmie River, north of Cedar Falls, Washington, Line Segment 398, Milepost 5.2. Sheet 391 - 8646 - 8, undated.
Milwaukee Road Engineering Drawing: Miscellaneous Plans, Bridge 2153.8 (FF142) - Cedar River, west of Trude, Washington, Line Segment 397, Milepost 2153.8. Sheet 391 - 8640, undated.
Milwaukee Road Engineering Drawing: Miscellaneous Plans, Bridge 2153.8 - Cedar River, west of Trude, Washington, Line Segment 397, Milepost 2153.6, undated.
Milwaukee Road Engineering Drawing: Miscellaneous Details, Bridge 24.33 - Highway, between Palouse, Washington and Bovill, Idaho, Line Segment 396, Milepost 24.24. Sheet 388 - 8732 - 2, undated.
Milwaukee Road Engineering Drawing: Method of Erecting Slab, Bridge FF88 - Hanson Creek, west of Rockdale, Washington, Line Segment 397. Sheet 390 - 8614 - 54, undated.
Milwaukee Road Engineering Drawing: Masonry Location Plan, Bridge FF88 - Hanson Creek, west of Rockdale, Washington, Line Segment 397. Sheet 390 - 8614 - 2, undated.
Milwaukee Road Engineering Drawing: Masonry Location Plan, Bridge FF102 - Mine Creek, west of Garcia, Washington, Line Segment 397. Sheet 390 - 8616 - 2, undated.
Milwaukee Road Engineering Drawing: Longitudinal Struts MN1, Bridge FF102 - Mine Creek, west of Garcia, Washington, Line Segment 397. Sheet 390 - 8616 - 38, undated.